background image

1

KM, KS, KXL & KL Channel  - 

 Installation Instructions

Please read all instructions prior to installation and keep for future reference!

1. Product to be installed by a qualied electrician.
2. Prior to installation ensure power is off at fuse box to prevent electrical shock.

*LUMINII RESERVES THE RIGHTS TO CHANGE SPECIFICATION & INSTRUCTION WITHOUT NOTICE

1.1

 Snap the lens into the channel, then align & center the channel to the 

       determined location. Then make any reference marks if needed to install 
       the channel, reference step 3 for mounting options.

Note:

 

Prior to install, 24VDC power must be present for wiring.

 

Also 

review and account for all parts necessary to install properly.

Caution:

 

Safety equipment is recommended, when modifications are being 

made to the channel & lens.

2.1

 

Extrusion & lens can be cut in the field. Using the proper blade for 

        aluminum, cut to the desired length.

2

miter saw

2.1

lens

channel 

2.1

REV0.4 02192020

Models KMC-XX, KSC-XX, KXLC-XX, & KLC-XX

30" maximum spacing

of mounting brackets

mounting brackets

#4 flat head 

wood screws

channel

STEP A

STEP B

STEP C

tighten screws below 
channel surface 
before installing LineLED

drill through 
channel for 
mounting 
holes

countersink 
the holes 

3

flathead screw

1.1

4”

4”

every 30”

mounting 

bracket

fixture

surface

loosen screws

3.1

 

Secure the channel to the surface by either mounting directly with 

        screws or using mounting brackets.

       

 Make counter sunk holes through 

a. If mounting channel with screws:

           the channel followed by screwing directly to the surface.

       b. If mounting channel with brackets :

fixed mounting brackets

 For 

            install a bracket 4” from each end, followed by installing one every 
            30”. Then secure, by screwing through the bracket to the surface. 
            For 

, install a bracket 4” from each 

adjustable mounting brackets

            end, followed by installing one every 30”. Then secure, by slightly 
            loosening the 2 screws on the side of each adjustable bracket. 
            Then secure, by screwing through bracket to the surface. Then 
            rotate to the desired position, followed by tightening the side 
            screws.

MOUNT EXTRUSION 

 WITH MOUNTING BRACKETS

FIXED BRACKET

ADJUSTABLE BRACKET

channel

4.0”

30.0”

30.0”

4.0”

30" maximum spacing

of mounting brackets

MOUNT CHANNEL

 WITH SCREWS

install #4 flat head wood 

screws a maximum 30" 

apart minimum of 2 
screws per channel.

3.1

3.1

3.1

Page 1 of 2 

Reviews: