background image

4

!

Remarks concerning the operator safety:
P11P, P13P and P13B transducers are destined to be mounted on

35 mm DIN rails. In the range of operational safety they are in

conformity with the EN 61010-1standard requirements.

l

The installation and transducer connection should be

operated by a qualified personnel.

l

One must take into consideration all accessible protection

requirements.

l

Before switching the instrument on, one must check the

correctness of the network lead connection.

l

In case of the protection terminal connection with a separate

lead one must remember to connect it before the connection

of network leads.

l

Do not connect the instrument  to the network through an

auto-transformer.

l

Before taking the transducer housing out, one must turn

the supply off.

l

The removal of the transducer housing during the guarantee

contract period may cause its cancellation. The programmer

connector is destined only for the PD11 programmer

connection. After the transducer programming, one should

put the hole plug of the programmer connector.

3. TRANSDUCER SET

The transducer set includes:
- P11P or P13P or P13B transducer 1 pc
- service manual

1 pc

- guarantee card

1 pc

Summary of Contents for P11P

Page 1: ...1 ISO 9001 ISO 9001 C E R T Y F I K A T SERVICE MANUAL POWER TRANSDUCERS FOR SINGLE PHASE AND THREE PHASE NETWORK P11P P13P and P13B 45 120 100 mm...

Page 2: ...ALLATION 7 5 1 Fixing 7 5 2 Connection diagrams 8 5 2 1 Measurement of active power in a single phase network 8 5 2 2 Measurement of active power in a 3 phase 3 wire network 9 5 2 3 Measurement of rea...

Page 3: ...al position Transducer housings are made of a self extinguishing plastic and are adapted to be fixed on 35 mm DIN rail DIN EN 50 022 35 P11P transducer destined for active power measurement in a singl...

Page 4: ...l In case of the protection terminal connection with a separate lead one must remember to connect it before the connection of network leads l Do not connect the instrument to the network through an au...

Page 5: ...rement 0 6 VA current measurement 0 3 VA supply 6 VA preheating time of the transducer 15 min set up time of the output signal 0 90 0 5 s insulation test voltage 3 25 kV limitation of output current 2...

Page 6: ...nal magnetic field 0 1 k 100 A m Input overload Voltage short duration 2 Un long lasting 1 2 Un Current short duration 10 In long lasting 1 2 In Ensured protection degree through the housing IP 50 fro...

Page 7: ...to be installed on a 35 mm DIN rail acc DIN EN 50 022 35 On the external side of the transducer there are screw or self locking terminal strips enabling the connection of 2 5 mm2 external leads suppl...

Page 8: ...e phase network by a P11P transducer 10 9 15 16 1 L1 2 3 5 P11P N or L2 Supply Output 10 9 15 16 1 L1 S1 S2 2 3 5 P11P N or L2 P1 P2 Supply Output a Direct measurement of single phase active power b M...

Page 9: ...ase active power through a current and voltage transformer 5 2 2 Measurement of active power in a 3 phase 3 wire network by a P13P transducer Symmetrically loaded 10 9 15 16 1 2 L1 3 5 8 P13P Supply O...

Page 10: ...S2 2 3 5 P13P Supply Output P1 P2 B A 8 L2 L3 b a B A b Measurement of active power in a 3 phase 3 wire network symmetri cally loaded through a current transformer c Measurement of active power in a 3...

Page 11: ...d 10 9 15 16 1 L1 3 5 8 P13B Supply Output L2 L3 L2 10 9 15 16 1 L1 S1 S2 3 5 P13B Supply Output P1 P2 L3 8 a Direct measurement of reactive power in a 3 phase 3 wire network symmetrically loaded b Me...

Page 12: ...through a current and a voltage transformer 6 CODING AND ORDERING Coding example The P11P A1 C 1 1 1 00 0 code means the execution of a transducer for measurement of active power in a single phase sy...

Page 13: ...V from the table 2 100 3 V A 400 000 100 V W on order 9 Output range 0 5 mA R obc 0 2000 W 1 0 20 mA R obc 0 500 W 2 4 20 mA R obc 0 500 W 3 0 10 V R obc 500 W 4 5 0 5 mA R obc 0 2000 W 5 20 0 20 mA R...

Page 14: ...0 200 300 400 600 800 500 750 1 1 5 2 3 4 1 1 5 2 3 4 6 8 1 5 2 5 3 5 6 10 12 2 5 3 5 7 5 10 12 20 2 5 3 5 6 10 12 20 3 5 7 5 10 15 20 25 5 6 7 5 10 10 12 15 20 20 25 30 25 40 50 40 40 80 150 300 500...

Page 15: ...tion of the granted guarantee 2 After the guarantee period One should turn over the transducer to repair it in a certified service workshop Spare parts are available for the period of ten years from t...

Page 16: ...EL S A ul Sulechowska 1 65 950 Zielona G ra Poland Tel 48 68 329 51 00 exchange Fax 48 68 329 51 01 e mail lumel lumel com pl http www lumel com pl Export Department Tel 48 68 329 52 38 Fax 48 68 325...

Reviews: