2-1-1
U25MEN
STANDARD MAINTENANCE
Service Schedule of Components
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording Model only
H: Hours : Check
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B27
Tension Lever Sub Assembly
I
I
B31
AC Head Assembly
I
B573,B574
Reel S, Reel T
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
B133
Idler Assembly
I
I
B410
Pinch Arm (A) Assembly
I
I
B414
M Brake S Assembly
I
I
B416
M Brake T Assembly
I
I
B525
LDG Belt
I
I
Summary of Contents for VCR425
Page 22: ...1 8 6 1 8 7 1 8 8 HC341SCM2 Main 2 4 Schematic Diagram...
Page 23: ...1 8 9 1 8 10 1 8 11 HC341SCM3 Main 3 4 Schematic Diagram...
Page 25: ...Jack Schematic Diagram 1 8 15 1 8 16 HC341SCJ...
Page 26: ...1 8 17 1 8 18 Function Schematic Diagram HC341SCF...
Page 29: ...Jack CBA Top View Jack CBA Bottom View BHC400F01018 E 1 8 25 1 8 26...
Page 30: ...Function CBA Top View Function CBA Bottom View 1 8 27 1 8 28 BHC400F01018 B...
Page 49: ...2 4 6 U25PALDA S 12 19 Cap Belt Fig DM11 Fig DM12 20 C 1 21...
Page 55: ...3 1 1 HC341FEX A1X EXPLODED VIEWS Front Panel...
Page 74: ...VCR425 HC341ED...