background image

Operating Manual V8.2/03.2017 

 

Non Invasive Road Sensor 

 

G. Lufft Mess- und Regeltechnik GmbH, Fellbach, Germany 

21

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 7: Installation 
Sketch Gantry 

 

 

 

 

 

 

 

 

8.3.4 

Installation Sketch Gantry 

 

Lateral view from the side of the road. 

 

 

 

 

 

Measurement distance c: 

6 to 15m 

Measurement angle α:   

between 45 and 85° 

Measurement surface diameter d = measurement distance c / 10 

 

 

α 

Direction of 

traffic 

Traffic 

sign 

NIRS31-UMB 

Road surface 

Summary of Contents for NIRS31-UMB

Page 1: ......

Page 2: ...G Lufft Mess und Regeltechnik GmbH Fellbach Germany Subject to change without notice 48 7230 NIRS31E Document version V8 2 03 2017...

Page 3: ...MB 10 5 Generation of Measurements 11 5 1 Current Measurement act 11 6 Operation Modes 11 6 1 Normal Operation 11 6 2 Energy Saving Mode 11 7 Measurement Output 12 7 1 Measurements 12 7 2 Additional S...

Page 4: ...Test 32 14 5 Checking the Sensor Adjustment 33 14 6 Generate Status File 33 15 Technical Data 34 15 1 Measurement Range Accuracy 35 15 2 Drawings 36 16 Fault Description 37 17 Disposal 38 17 1 Within...

Page 5: ...ssioning must only be carried out by suitably qualified specialist personnel Never take measurements on or touch live electrical parts Pay attention to the technical data and storage and operating con...

Page 6: ...consists of the following components Sensor NIRS31 UMB Mast clamp Sounding pipe Operating manual Transport packaging Note The delivery does not include a connection cable this must be ordered to the...

Page 7: ...cable including connector 8371 UK050 Power supply unit 24V 100VA 8366 USV1 ISOCON UMB 8160 UISO Surge protection 8379 USP 3 2 Spare Parts Reflector unit 8710 ULAMP 3 3 Additional Documents and Softwar...

Page 8: ...e plug in terminal and associated connection cable available in lengths of 15m and 50m The measured values can be requested over the RS485 interface in accordance with the UMB protocol During commissi...

Page 9: ...ent sodium chloride NaCl 4 8 Snow Height The sensor detects the snow height in the field of measurement Note the snow height is an additional information and it is not part of the water equivalent 4 9...

Page 10: ...g Manual V8 2 03 2017 Non Invasive Road Sensor 10 G Lufft Mess und Regeltechnik GmbH Fellbach Germany Fig 1 Sensor Technology 4 10 Sensor Technology NIRS31 UMB Receiver Pyrometer Reflector unit Soundi...

Page 11: ...ements the sensor is switched to a standby mode Thereby the power consumption is reduced on average to lower than 35 6 2 1 Restrictions in Energy Saving Mode Note Setting the sensor to energy saving m...

Page 12: ...ure 40 0 158 0 F 7 1 2 Freezing Temperature Sampling rate 1 minute Units C F Request channels UMB Channel Measuring Range act min max avg Measurement Variable float32 min max unit 110 Freezing tempera...

Page 13: ...ater water film height is equal or greater than the wet threshold snow ice frozen water is on the road it s in the form of snow or ice a differentiation is not possible snow frozen water is on the roa...

Page 14: ...ng rate 1 minute Units Request channels UMB Channel Measuring Range act min max avg Measurement Variable float32 min max unit 810 Saline concentration NaCl 0 0 100 0 7 1 8 Snow Height Sampling rate 1...

Page 15: ...the reflector unit to restore correct operation 7 2 1 Measure Status UMB Channel act Measurement Variable uint8 4003 Measure Status Bit 0 Status Transmitter 0 transmitter is working properly 1 transmi...

Page 16: ...UMB Channel Measuring Range act Measurement Variable float32 min max unit 4004 energy consumption ratio 0 0 100 0 In normal operation mode the energy consumption ratio and thus the energy consumption...

Page 17: ...ening Attach the bracket to the mast at the prescribed height using the bolts nuts and washers provided Hold the nut firmly with one wrench and tighten the bolts evenly and securely with the second wr...

Page 18: ...nter of the measurement field on the road surface Align the sensor with the center of the roadway while retaining the angle of measurement between 45 and 85 and firmly tighten the bolts Note If you wi...

Page 19: ...or a complete road section ATTENTION Only approved and tested appliances conductors risers etc should be used to install the device on the mast All relevant regulations for working at this height must...

Page 20: ...Sensor 20 G Lufft Mess und Regeltechnik GmbH Fellbach Germany Fig 6 Installation Sketch Mast 8 3 3 Installation Sketch Mast Measurement distance c 6 to 15m Measurement angle between 45 and 85 Measurem...

Page 21: ...rmany 21 Fig 7 Installation Sketch Gantry 8 3 4 Installation Sketch Gantry Lateral view from the side of the road Measurement distance c 6 to 15m Measurement angle between 45 and 85 Measurement surfac...

Page 22: ...N 47100 Note the connection cable screen must NOT be laid to ground in the control panel If the equipment is not connected correctly It may not function It may be permanently damaged The possibility o...

Page 23: ...B 8160 UISO Note Please refer to the ISOCON UMB operating manual when assembling the system 9 6 Use of Surge Protection 8379 USP When using surge protection order no 8379 USP please refer to the conne...

Page 24: ...he UMB Config Tool Only switch on the power supply after the installation is complete Readjustment is necessary in the event of any change to the position alignment and measurement distance or install...

Page 25: ...ct a NIRS31 UMB with associated ID ID 1 in this example Check the sensor in the list with a mouse click and select the Configure function In sensor configuration now select the Load profile from senso...

Page 26: ...missivity 0 95 Water film moisture threshold 30 m Water film wetness threshold 100 m Note The device ID must be changed if several non invasive road sensors are operated on a UMB network as each devic...

Page 27: ...aving the configuration on the sensor the sensor communicates at the new baud rate When operating the sensor in a UMB network with ISOCON UMB this baud rate must not be changed otherwise the sensor is...

Page 28: ...twork during the function test 12 3 1 Channels for Measurement Polling You can select the channel for measurement polling by the UMB Config Tool by clicking on the respective channel Note Channel sele...

Page 29: ...out a firmware update on site with no need to remove the sensor and return it to the manufacturer The firmware update is carried out with the aid of the UMB Config Tool The description of the firmwar...

Page 30: ...specialists only and in dry weather no precipitation as the housing has to be opened Otherwise the equipment can be damaged due to the presence of moisture inside the unit Important note When carryin...

Page 31: ...two screws Pay attention that no cable will be trapped while closing the front 14 2 Cleaning the Transmitter and Receiver Plates If the transmitter and receiver plates are dirty clean them with a damp...

Page 32: ...m the performance of maintenance with OK Important note Only use this function if maintenance was actually carried out and the reflector unit was actually replaced Important note When carrying out thi...

Page 33: ...To verify the adjustment chose the menu Options NIRS31 UMB NIRS31 UMB check adaption in the UMB Config Tool Check the sensor ID and if necessary change it to the ID of the Sensor then click the Check...

Page 34: ...approx 9 9 kg Mast bracket weight approx 1 0 kg Fastening Mast bracket for 60 76mm Protection class III SELV Protection type IP65 Storage conditions Permissible storage temperature 40 C 70 C Permissib...

Page 35: ...Spectroscopic Measuring range 0 2000 m Resolution 0 01 m Sampling rate 1 minute Units m mil 15 1 4 Freezing Temperature Measurement process Spectroscopic Measuring range 40 C 0 C Resolution 0 1 C Samp...

Page 36: ...Operating Manual V8 2 03 2017 Non Invasive Road Sensor 36 G Lufft Mess und Regeltechnik GmbH Fellbach Germany Fig 16 NIRS31 UMB 15 2 Drawings...

Page 37: ...nel was requested that is not available on this device Device transmits error value 28h 40d Device is in initialization phase after start up wait until first measurement is complete Device transmits e...

Page 38: ...trical and electronic equipment in your respective country 18 Repair Corrective Maintenance Please arrange for any faulty equipment to be checked and if necessary repaired by the manufacturer exclusiv...

Page 39: ...m height 0 0 393 7 mil Ice layer thickness 601 ice layer thickness 0 0 2000 0 m 606 ice layer thickness 0 0 393 7 mil Snow height 610 snow height 0 0 10 0 mm Ice percentage 800 ice percentage 0 0 100...

Page 40: ...ce 32 Road is wet with liquid water aqueous solution 64 Road is covered with frozen water solid aqueous solution 65 Road is covered with snow or slush Mixture of liquid and frozen water or aqueous sol...

Page 41: ...oad transmission 02h 1 byte cmd Command 1 byte verc Version number of the command 1 byte payload Data bytes 0 210 bytes ETX Control character for the end of payload transmission 03h 1 byte cs Check su...

Page 42: ...t is 23h The version number of the command is 1 0 10h The channel number is in payload as can be seen from the channel list page39 the current road surface temperature in C in the channel is 100d 0064...

Page 43: ...suring range e g ADC over range 53h 83d 54h 84d Error in measurement data or no valid data available 55h 85d Device sensor unable to carry out valid measurements due to ambient conditions 19 3 6 CRC C...

Page 44: ...Commands Command Function BC AZ M Online data request l X Switches to binary protocol k R Triggers software reset k D Software reset with delay k I Device information k These operating instructions de...

Page 45: ...lm height Water film height 0 0 2000 0 m Snow depth Snow depth 0 0 10 0 mm Percentage Ice percentage 0 0 100 0 Saline concentration 0 0 100 0 Friction 0 0 1 0 none 19 4 5 Status and Error Codes in ASC...

Page 46: ...he baud rate to 1200 Measurement data can be transmitted alternatively in metric or US units The selection is done by the UMB Config Tool Metric units US units When operating the device in SDI 12 mode...

Page 47: ...b 0 9 A Z a z aM Measurement basic data set aMC Measurement basic data set transmit values with CRC aC Concurrent measurement basic data set aCC Concurrent measurement transmit values with CRC aD0 Dat...

Page 48: ...ocument always measure continuously During certain phases of the measurement process the availability of the device for communication is limited This causes some special properties The device does not...

Page 49: ...e variant with without pyrometer Buffers 1 to 3 are available only from devices with pyrometer If the measurement value is not available for some reason e g sensor failure this is indicated by a value...

Page 50: ...easurement values are available 0D0 0 251 4 30 0 2 CR LF Water film 251 4 m ice percentage 30 0 road condition 2 0D1 0 12 4 5 1 CR LF Road surface temperature 12 4 C freezing temperature 5 1 C 0D2 0 3...

Page 51: ...ing temperature NaCl 110 40 0 70 0 C Buffer 2 Snow height 610 0 0 10 0 mm Saline concentration NaCl 810 0 0 100 0 Buffer 3 Friction 820 0 0 1 0 Road Weather Index 910 0 1 2 Code Device configured for...

Page 52: ...ponds with a0004 CR LF to the request i e 4 values are available in the buffers The first measurement value transmitted in buffer 0 contains the status information of the measurement channels The stat...

Page 53: ...o change the unit system used for the SDI 12 data between metric and US units It is implemented as manufacturer specific X command Command aXU u m Response aU u m CR LF u US units m metric units Examp...

Page 54: ...e pyrometric temperature measurement Command aXO nn n nn n offset in C Response aXO nn n CR LF The response to the attempt of setting of an invalid value is aXOf CR LF Example The offset shall be set...

Page 55: ...rved otherwise the new adjustment of the sensor cannot be completed successfully Command aXRs Response aXRok CR LF The response is followed by the station reset i e the station will be offline for a f...

Page 56: ...hment 17 Fig 4 Aligning the Sensor 18 Fig 5 Roadway Condition 19 Fig 6 Installation Sketch Mast 20 Fig 7 Installation Sketch Gantry 21 Fig 8 Connector 22 Fig 9 Connection to ISOCON UMB 23 Fig 10 New A...

Page 57: ...I Ice Layer Thickness 12 ICe Layer Thickness 8 Ice Percentage 8 14 Incorrect Use 5 Installation 17 Installation Location 19 Interface 22 34 ISOCON UMB 23 L Lamp Status 15 M Maintenance 30 Measurement...

Page 58: ......

Reviews: