Installation
Revision R09, November 2016
21
6
Installation
CAUTION
There is danger of mechanical damage!
The owner/operator of the CHM 15k will be responsible for dimensioning
and manufacturing a concrete base. This mounting base must be properly
sized to withstand the lasting strain that is caused by the equipment's
own weight and by external influences.
CAUTION
There is danger of mechanical damage!
The device must not be opened during work for setting up or starting up,
in order to prevent the penetration of dirt or humidity. If opening
becomes necessary, e.g. following a malfunction, work of this kind may
only be performed by duly instructed personnel.
The CHM 15k Cloud Height Meter is assembled and fixed on a suitably sized
concrete foundation.
Levelling screws are integrated with the bottom of the support legs to allow for
vertical adjustment and, hence, vertical adjustment of the measuring unit.
6.1
Installing the CHM 15k
6.1.1
Preparatory Work
Before CHM 15k installation may begin, diameter 12 holes and dowels (4 dowels
included in delivery) have to be made and inserted in accordance with the drill-
ing template (Fig. 4).
Make sure that the outer door is properly oriented for power connections to the
power box of the operator.
Fig. 4:
Drilling template
2
1
3
4
Summary of Contents for CHM 15k Nimbus
Page 6: ......
Page 14: ......
Page 20: ......
Page 100: ...Revision R09 November 2016 100 Declaration of Conformity...