Operating Manual
UMB Analogue/Digital Converter ANACON
G. Lufft Mess- und Regeltechnik GmbH, Fellbach, Germany
11
Installation and Commissioning
1. First configure all the modules using the
UMB-Config-Tool
configuration software in accordance with
your requirements (see
Configuration
chapter).
2. Clip the required number of mounting rail bus connectors onto the DIN rail and then connect all the
ANACON modules.
3. Connect the sensors to channels A and B of the ANACON module. Please note that a fixed assignment
is specified for channels A and B for the combined sensors for temperature and relative humidity as well
as the wind speed and wind direction sensors. A summary of the sensor connection scheme is provided
in the table below.
4. Now connect the 24V power supply to the mounting rail bus connectors.
5. Connect your host system to any desired ISOCON RS232 interface. The equipment is now ready for
operation.
Connecting the ANACON modules to the DIN rail
ATTENTION: Only mount or remove modules
from the DIN rail when the power is switched
off
The assembly must take place on a grounded
DIN rail!