Ludlum Measurements 239-1F Manual Download Page 6

 

Model 239-1F Floor Monitor 

 December 

2010 

 

3. 

 

GAS 

BOTTLE 

INSTALLATION                 

 

 

1.

 

The instrument typically comes with a regulator, a valve, a brass fitting, two white plastic 
compression nuts, and some vinyl tubing.  The valve is in the box with the regulator, the 
other parts may be in a separate bag.

 

2.

 

Screw the valve into the output of the regulator.  If there is an arrow on the valve, it should 
point away from the regulator.  Screw the fitting onto the valve.  Use Teflon tape or sealant 
on the connections.

 

3.

 

Set the gas bottle onto the cart and secure with the provided strap.  To adjust the strap, open 
the buckle completely, extend or retract the strap through the latch as necessary then close 
the buckle.  Attach the regulator onto the bottle.

 

4.

 

Remove the existing nut from the fitting on the regulator.  Insert one end of the vinyl tubing 
into one of the plastic nuts and screw the nut onto the fitting.  Finger tight is sufficient.

 

5.

 

Cut the subbing to the desired length to reach the top of the box on the handle of the cart that 
has the flowmeters.  Remove the existing nut from the fitting on the quick disconnect above 
the “IN” flowmeter.  Insert the other end of the vinyl tubing into one of the plastic nuts and 
screw the nut onto the fitting.  Finger tight is sufficient.

 

6.

 

Proceed to the operating procedures section of this manual.

 

 
 
4. OPERATING 

PROCEDURES 

 

 

3

CAUTION: If the output has a quick-

connect fitting, insert a male quick-connect 
prior to applying the gas supply. 
 

o

 

Turn the flow control valve off. 

 

3

CAUTION: Do not overtighten. 

 

o

 

Turn valve on gas supply bottle to the 

OPEN position.  The high pressure regulator 
should show the supply pressure from the gas 
bottle. 

 

o

 

Turn outlet regulator valve clockwise to 

register between 3-5 psi. 
 

o

 

Open the flowmeter valve on the cart's 

input flowmeter.  Adjust the input flowmeter to 
100 cc/min to flush the air out of the detector.  
After flush, flow may be reduced to 35 cc/min.  
Allow 10 minutes to purge the system. 
   

 

3

 

NOTE: The outlet flow indicator on 

the flowmeter box will not immediately 
indicate flow when system is first turned 
ON.  The primary purpose of the outlet 
flowmeter on the flowmeter box is to check 
for system leaks.  This process is addressed 
in the Maintenance Section to follow. 
 

o

 

Connect the detector to the counting 

instrument 

 
(1) HV is preset at the factory to read 

alpha, beta, and gamma. 

(2) Background count will read 

approximately 1000-1400 cpm. 

(3) If only alpha detection is required, 

the HV may be adjusted to where the 
background will read 0-5 cpm.   
 

o

 

Adjust the height of the detector for 

optimum performance. 

 

 

 

page 2  

Summary of Contents for 239-1F

Page 1: ...LUDLUM MODEL 239 1F FLOOR MONITOR Revised December 2010 LUDLUM MEASUREMENTS INC 501 OAK ST P O BOX 810 SWEETWATER TX 79556 325 235 5494 FAX 325 235 4672 ...

Page 2: ...anty of merchantability or fitness which extend beyond the description of the face there of If the product does not perform as warranted herein purchaser s sole remedy shall be repair or replacement at the option of Ludlum Measurements In no event will Ludlum Measurements be liable for damages lost revenue lost wages or any other incidental or consequential damages arising from the purchase use or...

Page 3: ...Model 239 1F Floor Monitor December 2010 TABLE OF CONTENTS 1 GENERAL 1 2 SPECIFICATIONS 1 3 GAS BOTTLE INSTALLATION 2 4 OPERATING PROCEDURES 2 5 MAINTENANCE 3 6 REPLACEMENT PARTS LIST 4 ...

Page 4: ...Model 239 1F Floor Monitor December 2010 Model 239 1F Floor Monitor shown with Ludlum Model 2221 ...

Page 5: ... cm2 one or two layers metalized mylar alpha beta gamma b 3 9 mg cm2 one layer metalized mylar one layer 3 5 mg cm2 mylar beta gamma c 7 9 mg cm2 one layer metalized mylar one layer 7 5 mg cm2 mylar gamma EFFICIENCY 4π 17 239 Pu 25 90 Sr 90 Y gamma 1 Efficiencies are expressed in 4pi geometry and calculated with a probe using the 0 8 mg cm2 Mylar window at a fixed height of 3 16 inches distance fr...

Page 6: ...he plastic nuts and screw the nut onto the fitting Finger tight is sufficient 6 Proceed to the operating procedures section of this manual 4 OPERATING PROCEDURES 3CAUTION If the output has a quick connect fitting insert a male quick connect prior to applying the gas supply o Turn the flow control valve off 3CAUTION Do not overtighten o Turn valve on gas supply bottle to the OPEN position The high ...

Page 7: ...ow counting gas to escape causing degradation of detector efficiency If the window needs replacing in the detector the detector should be checked both for gas leaks and HV shorts before replacing detector on the cart Indication of a broken wire is low or erratic HV reading Foreign particles wire tails on the standoff posts or solder peaks can cause excessive counts Loose wires can cause reduced co...

Page 8: ...EA Main Box Screened 9175 014 1 EA 5 Ft C Cable 8303 022 10 EA PLT2M Cable Tie 03 5410 4 EA Stem Fit B OC4 D 400 13 7912 2 EA M Pipe Fit B QC4 B 2PM 13 7920 2 EA Grommet 2170 18 8774 1 EA Flowmeter RMA 150 SSV 21 9547 1 EA Flowmeter RMA 150 21 9548 15 FT Vinyl Tubing 59002 22 9514 12 FT Swaglok B 400 1 2 22 9522 10 EA Swaglok Insert B 405 2 22 9639 28 IN Edge Trim 8451A53 22 9828 REGULATOR 2310017...

Reviews: