Lucent Technologies Supplemental Battery Stand J85504D-1 List 16
Issue 2 September 2000
Installation Procedures 6 - 1
6
Installation Procedures
Positioning
Battery Stand
1. Temporarily position the stand per office layout and mark (trace)
holes for anchor bolts using marking pen or pencil.
2. Remove stand, and drill holes for the anchors specified for the
application. Holes should be drilled in preferred anchor positions
shown in Figure 6-1 designated as A1 and B1. Anchor positions
A2 and B2 should only be used when interference with floor
reinforcing bars occurs.
Figure 6-1: Typical Battery Stand Footprint
Stand Width
(Width)
Stand Depth
(Depth)
B2
B1
B1
B2
A2
A1
A1
A2
2.00 TYPICAL
Mounting center to center
(CCTR)
CB
Stand Edge to
Mounting Center
(ECTR)
BCTR
Back of Stand
Front of Stand
FCTR
Stand Edge to
Mounting Center
(ECTR)
Mounting Positions
Disconnect Switch
(DSW)
Table 6-A: Floor Drilling Data
Battery
Stand
List
No.
Width
Depth CCTR ECTR
AB
CB
BCTR FCTR
DSW
J85504D-1
16
31.68
19.18
24.18
3.75
4.18
12.90
1.77
4.50
2.43