363-206-295
DLP-
508
8
of
1
Page
1997
December
1,
Issue
Test
Transmission
DS3
Perform
1.
1:
NOTE
the
in
tests
transmission
DS3
perform
to
used
be
may
procedure
This
When
direction.
DSX)
the
(toward
demux
or
fiber)
the
(toward
mux
is
it
tests,
DS3
end-to-end
perform
to
used
being
is
procedure
this
been
already
has
system
end-to-end
complete
the
that
assumed
this
at
tested
being
is
channel
DS3
particular
a
only
that
and
tested
the
in
tests
Transmission
time.
mux
or
local
be
may
direction
the
in
tests
Transmission
1).
Figure
(See
tests
end-to-end
demux
Commands
The
2).
Figure
(See
tests
cross-connect
local
are
direction
an
gives
TEST-TRMSN-T3,
under
manual,
this
of
section
Reports
and
commands.
of
explanation
2:
NOTE
test
automated
the
and
CIT
a
with
either
performed
be
can
test
This
command
test-trmsn-t3
set.
test
DS3
a
with
or
3:
NOTE
DDM-2000
one
tests,
end-to-end
do
to
used
is
procedure
this
When
far
the
as
shelf
other
the
and
end
near
the
as
to
referred
be
will
shelf
near-
the
be
can
shelf
either
arbitrary;
are
designations
These
end.
shelf.
far-end
the
or
end
4:
NOTE
the
establish
to
shelf
each
at
made
be
must
cross-connections
Proper
TARP
tested.
being
circuit
DS3
the
for
path
end-to-end
complete
manual
only
supports
and
cross-connections
default
no
has
7
Release
following
the
of
description
the
See
cross-connections.
STS-1
manual:
this
of
section
Reports
and
Commands
the
in
commands
dlt-crs-sts1
,
dlt-crs-sts3c
,
ent-crs-sts1
,
ent-crs-
sts3c
,
rtrv-crs-sts1
,
rtrv-crs-sts3c
,
set-ne
and
,
rtrv-
ne
See
.
Provisioning
Cross-Connection
and
Administration
the
in
on
information
more
for
manual
this
of
section
Provisioning
provisioning.
cross-connection