background image

LSC850D Owner's Manual

page 2

mainframe spreader 

2

bolt package step 2 

 

1.  mainframe setup

  

 

2.  mainframe spreader  

3.  install H-units

 

mainframes [right and left and center] 

3

w/ legs attached  

 

H-units 4

bolt package step 3 

2

Bolt the mainframe spreader tubes between the mainframes using:
 

8  –  5/16" x 2 1/2" hex bolts 

8  –  5/16" flat washers 

8  –  5/16" nylon lock nuts

Place the 2 H-units inside each pair of mainframes and attach using:
 

8  –  1/2" x 4 1/2" hex bolts 

29  –  1/2" flat washers 

8  –   1/2" nylon lock nuts

Place a washer under the head of each bolt, under the nut, and between 

the H-unit and the mainframe.  The bolts must be loose enough to allow 

the H-units to pivot.

adjustable wrenches 

2

or

1/2 wrenches 

2

9/16 wrenches 

2

3/4 wrenches 

2

7/16 wrench [for winch] 

1

tools needed

Set up the 3 mainframes with the leg sockets facing to the outside on the 

left and right mainframes and to the center on the middle mainframes.

NOTE 

 

Install all nuts and bolts loosely until the lift is fully assembled, then 

tighten all nuts and bolts properly.
Do not overtighten the nuts and bolts on your lift.  
Doing so may cause the lift to fail. When tightening against a tube, tighten 

until the aluminum just dimples. If you crush the tube, it may crack and 

fail under normal use.

LSC850D 

 

800 lb, 50" Double Beam Jet Lift

With proper care and maintenance, this lift will provide you with years of trouble free service. Please follow these instructions carefully.

Reviews: