1

 

Safety requirements 

Leggere le seguenti norme di sicurezza generali per evitare lesioni personali e prevenire danni al prodotto o 
ad eventuali altri prodotti ad esso connessi. Per evitare possibili danni, utilizzare questo prodotto unicamente 
nel modo in cui viene specificato. 
 

1.1

 

General requirements 

Only qualified service staff shall be authorized to carry out installation and maintenance procedures.

 

Install the tool in a clean, dry and safe place.

 Humidity, dust and extreme temperatures tend to deteriorate 

or damage the instrument. In such environments it’s recommended to install inside suitable containers. 

 

Power  the  instrument  appropriately.

  Respect  the  supply  voltages  indicated  for  the  instrument  model 

owned. 

Make the connections appropriately.

 Carefully follow the connection schemes provided with the instrumen-

tation. 

Do not use the product if you suspect the presence of malfunctions.

 If a malfunction is suspected, do not 

power the instrument and ask for the intervention of qualified service staff. 

Before any operation on electrical connections, power, sensors and communication equipment: 

 

 

Turn off the power. 

 

Discharge the accumulated electrostatic charges by touching a conductor or a grounded system. 

 

 

Do not operate the product in presence of water or moisture

Do not operate the product in an explosive atmosphere

Lithium-ion battery inside.

 Replacing the battery with an incorrect type can cause risk of explosion. 

 

1.2

 

Specific requirements 

The large heatsink protruding from the front of the 

SDU

 module is used to remove the high temperatures 

produced by the power circuits performing current injection. The temperature of this heatsink is normally 
less than 60 °C, but this depends on the conditions in which the instrument operates and the injection set-
tings, as well as the conditions of the soil and could exceed even 80 °C, therefore be careful not to touch it 
during the functioning of the system. 

The very same SDU unit is responsible for the ignition of high voltage circuits (200 Vcc) through the PWR unit; 
the ignition of this section of power occurs only during measurement operations; in this case the presence 
of high voltage is reported at several points: 

 

HV

 alert on the top of the 

SDU

 module.

 

 

Green lights for each of the 4 power sections, at the bottom right corner of the box. 

Summary of Contents for GRETA

Page 1: ...Environmental monitoring solutions Installation manual...

Page 2: ...he information included in this manual is subject to changes without notice No part of this manual may be reproduced in any form or by any electronic or mechanical means for any use without LSI LASTEM...

Page 3: ...requirements 5 1 3 1 Power connection 5 1 3 2 Internet connection 5 2 Installation 6 2 1 Plinth installation 6 2 2 Excavation of the trench 6 2 3 Unwind of the cable 7 2 4 Screw the electrodes 7 2 5 M...

Page 4: ...e any operation on electrical connections power sensors and communication equipment Turn off the power Discharge the accumulated electrostatic charges by touching a conductor or a grounded system Do n...

Page 5: ...most therefore still insufficient to cause death Considering a condition highly unlikely to occur but not theoretically impossible in which the operator is in contact with two electrodes the instrumen...

Page 6: ...orted by a galvanized iron tripod which has to be placed and fixed on a concrete plinth preferred or buried in the soil The plinth has to be placed in correspondence of the centre of the trench If the...

Page 7: ...the profile where the plinth is installed The first electrode must be positioned in correspondence of the m 0 of the trench 2 4 Screw the electrodes The electrodes are provided separately from the ca...

Page 8: ...rench and bury the electrodes When the trench is buried insert the cables inside the trench taking care of the distance of the central electrodes last electrode of first cable and first electrode of s...

Page 9: ...not pour water or salty water on the electrodes press them and cover them with more soil or use bentonite to enhance the contact Re do the contact resistance test 2 8 Cover the trench Mark the positi...

Page 10: ...GReTA Installation manual LSI LASTEM SRL INSTUM_04546_en Pag 10 10...