
11
ASSEMBLY INSTRUCTIONS |
STEP 3
1. Connect the push frame (#9) to the upper beam (#6) and fix with the connecting frame shaft (#27),
two
Φ
10 enlarged flat gaskets (#56) and two M10 nuts (#58).
2. Two swing pulley frames (#10) are connected to the column (#7) and fixed with Hexagon bolt M10*70
(#50), four
Φ
10 flat gaskets and two nuts M10 (#58) respectively.
3. Fix back cushion (#28) to column (#7) with Hexagon bolt M8C65 (#51) and
Φ
8 flat gasket (#57).
4. Insert the adjusting counterweight pin (#38) into the counterweight adjusting hole.
#50 M10*70 2PCS
#56(Enlarge)
Ø
10 2PCS
#51 M8*65 2PCS
#57
Ø
8 2PCS
#55
Ø
10 4PCS
#58 M10 4PCS
6
27
58
56
9
28
38
25
57
51
10
58
55
50
Summary of Contents for SSN105
Page 5: ...5 III PARTS LIST 1 PARTS LIST 2 3 4 5 6 7 8 PART LIST A 9 10 11 12 13 14 15 16 17 18 19 20...
Page 6: ...6 PARTS LIST 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 PART LIST B...
Page 7: ...7 40 PARTS LIST 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59...
Page 8: ...8 PARTS LIST 60 61 62 63 64 65 66 67 68 69 70...
Page 22: ......
Page 23: ......
Page 24: ...WWW LSGFITNESS COM AU...