79
G
1.
수동조작
4. Keep pushing the OFF button when the circuit breaker in a trip condition, and insert a handle to the body of the
circuit breaker.
5. Check the draw-out handle properly inserted and then push the lock plate and turn the draw-out handle clockwise
in order to insert the breaker.
6. When the breaker reaches the TEST position, the lock plate automatically projects and the draw-out handle is locked.
7. Push in the lock plate and turn the draw-out handle again clockwise until the lock plate projects, the inserting
operation is finished. At this time, the draw-out position indicator shows CONNECTED position.
1. Operating handle of cradle only can be inserted when
pushing OFF button.
2. If locking device for draw in/out protrudes, stop handle
operation and move to next procedure as it indicates
the complete operation of ongoing process.
Caution
3. Draw-in Operation
Disconnected
Position
Tested
Position
Connected
Position
Operation
Summary of Contents for Metasol Series
Page 32: ...31 D Digital Trip Relay D 3 Internal Circuit Diagram Internal Circuit Diagram ...
Page 38: ...37 D Digital Trip Relay D Ground Fault Protection 4 Relay Function ...
Page 39: ...38 Technical catalog for Susol Metasol ACB Technical catalog for Susol Metasol ACB D D IDMTL ...
Page 40: ...39 D Digital Trip Relay D PT A Curve 4 Relay Function ...
Page 136: ...K 136 138 1 Control Circuit 2 External Dimension Control Circuit and Dimension 135 ...
Page 153: ...152 Technical catalog for Susol Metasol ACB Technical catalog for Susol Metasol ACB Memo ...
Page 154: ...153 Technical Materials Memo ...