ALIGNMENT
Apply roughly a 1/2˝bead of silicone caulk along the left edge of the newly
fastened panels about 1-1/2˝from the panel edges. See Detail A below.
Align the angled edge of the left end cap with the roof centerline where it
will meet coincident with the end cap on the other side. See Detail B below.
SCALE 1:75
SCALE 1:75
DETAIL A
SCALE 1:4
1/2˝silicone
caulk bead
DETAIL B
SCALE 1:12
Align the angled
edge with the left
end cap and the
roof centerline
9
Step 3: Left End Cap Continued
Summary of Contents for ReadyPeak
Page 1: ...1 INSTALLATION MANUAL...
Page 3: ...1...
Page 5: ...3 STEP 1 Panel 1 SCALE 1 75 DETAIL A SCALE 1 20...
Page 8: ...DETAIL A SCALE 1 25 6 Step 2 Field Panels SCALE 1 75...
Page 10: ...SCALE 1 75 DETAIL A SCALE 1 14 8 Step 3 Left End Cap...
Page 15: ...13 Step 6 Ridge Cap DETAIL A SCALE 1 25 SCALE 1 75...