INSTALLATION INSTRUCTIONS
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not attempt
to assemble the product.
Estimated Installation Time:
45 minutes (24 hours for silicone caulk to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors, silicone
caulk, power drill with drill bit, measuring tape, level
1. As shown in the diagram, fully extend the
drawer and locate the plastic levers on the
metal glide tracks. Push the left-side and
right-side levers at the same time to
disengage the drawer from the drawer glides.
Gently lift the drawer up to remove it from
vanity (A).
WARNING
Vanity (A)
MUST
be secured to wall.
Note:
Clean area where the vanity (A) will be
permanently located prior to beginning installation,
ensuring the vanity (A) will not interfere with any
water supply and drain lines once mounted.
2. With two people, carefully place vanity (A)
against the wall in its final location.
While holding the vanity base firmly against the
wall, use the pre-assembled levelers on the
bottom of each leg of the vanity (A) to level the
item. Twisting the levelers counterclockwise
will raise the height of the vanity (A), and
twisting them clockwise will lower the vanity.
Once the vanity is in place, against the wall,
and level from front to back and side to side,
drill a hole through the vanity mounting area
and into the wall studs (as illustrated in
diagram 2). Using appropriate mounting
hardware (not included), secure the vanity (A)
to a wall stud. If possible, secure the vanity (A)
to two wall studs for increased stability.
1
A
1
2
2
1
2
A