Figure 52 - Plot Trendline
6. The formula of the line is
y=mx+b , where y is the engineering units at a given point
(measurement),
m is the slope of the line that represents the linear ratio, x is the A/D value at
a given point, and
b is the fixed zero load offset of the sensor. Enter the slope and offset as
the conversion values for the sensor channel under the applicable engineering units. In this
example, enter 0.1338 for the slope and -282.36 for the offset for the units conversion values
on the measured channel.
Figure 53 - Slope and Offset Values
70
Summary of Contents for V-Link-200
Page 1: ...LORD USER MANUAL V Link 200 Wireless 8 Channel Analog Input Sensor Node ...
Page 12: ...V Link 200 User Manual Figure 4 Viewing Node Diagnostic Data 12 ...
Page 15: ...V Link 200 User Manual 15 ...
Page 22: ...V Link 200 User Manual 22 ...
Page 35: ...V Link 200 User Manual Figure 31 DIN Rail Mount Option 35 ...
Page 45: ...V Link 200 User Manual Figure 36 Half and Quarter Bridge Wiring 45 ...
Page 76: ...V Link 200 User Manual 9 Troubleshooting 9 1 Troubleshooting Guide 76 ...