6
Installation
Travis Industries
9 3 5 0 8 1 0 8
0 4 0 1 9 9
Before You Begin
READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND USE THIS HEATER.
FAILURE TO FOLLOW THE INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE,
BODILY INJURY, OR EVEN DEATH.
Check with local building officials for any permits required for installation of this pellet heater and notify
your insurance company before proceeding with installation.
Packing List
• Thermostat & Wire • Door Latch Tool • Brush • Fuses (2) • Lag Bolts (2) • Scraper Rod Tool
Installation Options:
•
Residential or Mobile Home (see the section "Mobile Home Requirements")
•
Alcove Compatible (see the section "Alcove Installation")
•
Horizontal or Vertical Vent
•
Outside Air Compatible
•
Vent with L-Vent, L-Vent Fireplace Liner, or Type A Chimney (with adapter)
Planning The Installation
HINT:
Have an authorized Travis Industries dealer install this heater. If you install the heater
yourself, have your dealer review your installation plans.
HINT:
Sketch out a detailed plan of the installation including dimensions. Then verify the
dimensions with the requirements listed in this manual.
HINT:
When determining the location of the stove, locate the wall studs (for horizontal
penetrations) and ceiling trusses (for vertical penetrations). You may wish to adjust the
stove position slightly to ensure the vent does not intersect with a framing member.
HINT:
Place the heater outside and load 10 pounds of pellets inside the hopper. Plug the
heater in and let it run on HIGH until the pellets run out. This will cure the paint and burn
off any oil on the steel, eliminating any smell inside the home.
Stove Placement
•
Stove must be placed so that no combustibles are within, or can swing within (e.g. drapes,
doors), 36" of the front of the heater.
?
If the stove is placed in a location where the ceiling height is less than 7', it must follow the
requirements in the section "Alcove Installation Requirements".
HINT:
REDUCING CLEARANCES - Clearances may be reduced by methods specified in NFPA
211, listed wall shields, pipe shields, or other means approved by local building or fire
officials.
•
Heater and floor protection must be installed on a level, secure floor.
Floor Protection Requirements
•
The heater must be installed on a non-combustible floor protector extending the full width
and depth of the heater and extending 6" in front (Minimum 25" wide by 29" deep)
(minimum .018" thick - 26 gauge) .
•
Must extend under and 2" to each side and rear of a chimney "Tee" (if used).
Summary of Contents for Yankee
Page 2: ......