
9
4.1
Unpacking and Inspection
Carefully remove the system from its shipping carton and inspect it for any
signs of damage. Any damage should be reported immediately to the
carrier. Refer to the list of supplied parts (section 1.3) compare contents
received to list of parts supplied. Report any missing parts promptly to the
Loctite customer service department at 1-800-LOCTITE (562-8483).
4.2 Installation and Start-up
The Loctite
®
ZETA
®
7021 UV Spot Radiometer will arrive completely
assembled. All that is required is to plug in the Sensor Head and install a
9 Volt Alkaline Battery (Not included with unit). Battery is installed by
sliding off rear cover (see section 2). Turn on switch and you are ready to
make measurements.
4. Installation
985706 Zeta 7021 Rev A 4/17/02 4:15 PM Page 11