![Loctite 1390321 Operation Manual Download Page 9](http://html.mh-extra.com/html/loctite/1390321/1390321_operation-manual_1933760009.webp)
9
4. Installation
4.1
Unpacking and Inspection
Carefully remove the system from its shipping carton and inspect it for any signs of damage. Any
damage should be reported immediately to the carrier. Refer to the list of supplied parts (see
page 4) and compare to the contents. Report any missing or damaged parts promptly. In North America
contact 1-800-LOCTITE (562-8483) and for all other locations contact your local Henkel
customer service.
4.2
Environmental and Operating Conditions
-
Keep the pressure hose as short as possible. Short switch-on and switch-off time for the
dispensing valve are within reach.
-
Keep product feed lines as short as possible. The shorter the feed line the smaller the
specific resistance and the lower the dispensing pressure can be. Avoid kinking.
-
In any case, the pressure hose and product feed line should not be longer than 2 m.
-
Do not use inflexible hoses and feed lines, so that unnecessary loads on the fittings will be
avoided.
-
Keep all fitting tight.
-
No direct sunlight; no UV light.
-
No condensing humidity.
-
No splashing water.
4.3
Connecting the Unit
-
Use only the cable and hose sets supplied.
-
Connect power adapter with cord supplied to 24VDC power in connection (23).
-
Connect air pressure supply to pneumatic connection (22).
Summary of Contents for 1390321
Page 6: ...6 2 4 Overall Dimensions ...
Page 17: ...17 ...