background image

 

9

3. 

Pour concrete and before it starts to harden, check that it is parallel to the gate leaf and perfectly level. 

4. 

Mark the position of four expansion anchors according to the position of mounting hole on the base plate 

as soon as concrete become harden. Double check your marking, move the base plate and drill the 4 holes 
using a 10mm (3/8”) masonry bit. Put the 4 expansion anchors (provided) into the holes and firmly tighten. 

5. 

Place the opener onto base plate. Check that it is perfectly parallel to the gate leaf, and then screw the 

four nuts and washers supplied. It's only temporary installation. Further adjustment will be required when 
install the rack or chain. 
 
 

Manual Operation   

The opener should be put in the manual (emergency release) position before fitting the rack, installing the 
opener and limit switch. The process is as follows: 
1) Insert and turn the key clockwise 45° to slide the lock cover. Now the key slot appears. 
2) Insert the T-handle Key

provided

to the key slot and turn it in counter-clockwise 135° to disengage the 

clutch between the gear shaft and power output. Now the opener is in the manual operation. 

         

 

 
 

Fit the Rack 

There are two kinds of rack available as per buyer’s option, which are steel reinforced plastic rack and 
galvanized steel rack. The galvanized steel rack is usually used for the heavy duty gate. 

A. Fit the plastic rack reinforced with steel   

1. Start with gate in closed position 
2. There are four sections of plastic rack which is one meter length, each section for standard package. (you 
can order extra rack from dealer if necessary)   
2. Put one end of rack section on the gear of opener as a temporary support. 
Make rack level and mark the rack’s mounting holes (four holes) on the gate. 
3. Fit the rack by self-threading screws. This kind of plastic rack is quieter and allows height adjustments to 
be made even after it has been fixed. Please keep 1.0mm space between the rack and the gear to avoid the 
weight of the gate leaf effect on the opener. 

Summary of Contents for SFG 18H

Page 1: ...www WholesaleGateOpener com Rev 11a...

Page 2: ...7 Installation Overview 8 Installation of the Opener 8 Manual Operation 9 Fit The Rack 9 Installation of the Limit Switch 11 Connecting of the Control Board 11 Setting of the Control Board 13 Test the...

Page 3: ...rrying out any work on the installation Also disconnect any buffer batteries if fitted Fit an omnipolar or magnetothermal switch on the mains power supply having a contact opening distance equal to or...

Page 4: ...lied for exposed rollers B The opener is intended for installation only on gates used for vehicles Pedestrians must be supplied with a separate access opening The pedestrian access opening shall be de...

Page 5: ...nside and outside of a vehicular horizontal slide gate 2 One or more contact sensors shall be located at the bottom edge of a vehicular vertical lift gate 3 One or more contact sensors shall be locate...

Page 6: ...othly along its entire run and there is no excessive side slipping The opening and closing gate stops are positioned WARNING Remember that control devices are intended to facilitate gate operation but...

Page 7: ...6 It is suggestion that there is a 4 10cm distance at least between the gate edge and the gate wall when the gate is fully open Parts List...

Page 8: ...4 Dimensions 38 28 36 CM Class of gate opener I II Features Easy to install and low maintain Midway mode Quick selection for gate open close direction Reliable rolling code technology Emergency releas...

Page 9: ...pener You will need screwdrivers an electric drill wire cutters and a wire stripper a socket set and possibly access to a welder When install the opener you should build a concrete pad to support the...

Page 10: ...he lock cover Now the key slot appears 2 Insert the T handle Key provided to the key slot and turn it in counter clockwise 135 to disengage the clutch between the gear shaft and power output Now the o...

Page 11: ...from dealer if necessary 2 Put one end of rack section on the gear of opener as a temporary support Make rack level and mark the rack s mounting holes three holes on the gate 3 Weld the rack nut on t...

Page 12: ...nstall the magnet bracket so that the opener will stop at the desired open position when the open limit switch approaches it The higher magnet bracket must be installed at left side and lower magnet b...

Page 13: ...12 4 Alarm Lamp Optional One wire of the alarm lamp should be connected into the 4 terminal another should be connected into the 5 terminal...

Page 14: ...should be connected into the 12 terminal 9 Wired Keypad 12VDC Optional The RED wire of the wired keypad should be connected into the 12 terminal The BLACK wire of the wired keypad should be connected...

Page 15: ...to adjust the CLOSE stall force of the gate operator Turn the potentiometer clockwise to increase the stall force Turn the potentiometer counter clockwise to decrease the stall force Test the reversi...

Page 16: ...en erased How to use the remote to control the operator Key A is used to operate the operator to work alternately open stop close stop open When the Midway Mode function is enabled Key B is used to ac...

Page 17: ...ckets position b Please try to exchange the limit switch wires CL close and OP open There are two reed switches inside the magnetic limit switch one is upper and another is lower Maybe the magnet posi...

Page 18: ...www WholesaleGateOpener com 7106 S 220th St Kent WA 98032 USA sales WholesaleGateOpener com 2010 2012 LockMaster All Rights Reserved...

Reviews: