63
11
Maintenance
Maintenance and annual startup
Table 11A
Service and Maintenance Schedules
Service technician
(see the following pages for instructions)
General:
• Address reported problems
• Inspect interior; clean and vacuum if
necessary;
• Clean condensate trap and fill with fresh
water
• Check for leaks (water, gas, flue,
condensate)
• Verify flue and air lines in good condition
and sealed tight
• Check system water pressure/system
piping/expansion tank
• Check control settings
• Check ignition and flame sense electrodes
(sand off any deposits; clean and
reposition)
• Check wiring and connections
•
Perform start-up checkout and
performance verification per Section 9
in this manual.
• Flame inspection (stable, uniform)
• Flame signal (at least 10 microamps at
high fire)
•
Clean the heat exchanger if flue
temperature is more than 54°F above
return water temperature.
• Check anode rods.
• Check Delta T (Temperature Rise)
If combustion or performance
indicate need:
• Clean heat exchanger
• Remove and clean burner using
compressed air only
• Clean the blower wheel
ANNUAL START-UP
Owner maintenance
Daily
• Check water heater area
Monthly
• Check vent piping
• Check air piping
• Check relief valve
• Check condensate drain system
•
Check Delta T (Temperature Rise)
• Remove debris from Y-strainer
per manufacturer’s instructions
•
Check building recirculation
filter (if filter required)
• Check for and clean any debris
or obstruction from bird screens (if
equipped)
Every
6 months
•
Check water heater piping
(gas and water) for leaks
• Operate relief valve
• Check water chemistry
Installation & Service Manual