background image

Lead-Lag Cascade 

The “lead” boiler modulates with demand to capacity. As demand 
increases, additional boilers fire and modulate to capacity. This 
continues, with additional boilers firing and modulating to capacity
until all units are operating. Every 24 hours, the SMART SYSTEM 
automatically shifts the lead boiler role to the next in the sequence, 
distributing lead-lag runtimes equally.

Efficiency Optimized Cascade 

This feature optimizes the modulation capabilities of the Boiler Plant 
while evenly distributing run time across all cascaded boilers. Every 24 
hours the SMART SYSTEM automatically shifts the 1st boiler on role to 
the next in the sequence, distributing run time equally.

SMART SYSTEM Cascade option allows 2 - 8 boilers to be sequenced.

New Selectable Cascade Options

When multiple KNIGHT boilers are installed together, the SMART SYSTEM built-in sequencer can 
be set for “Lead-Lag” cascade or “Efficiency Optimized” cascade operation.

At-a-Glance Color-Coding

The new SMART SYSTEM

 is the most advanced 

integrated boiler control on the market today.

Larger LCD Screen 

Displays more information.

Soft Keys 

For simple programming.

Navigation Dial

For fast transitions from screen to screen 
and easy adjustment of settings. 

USB Port

USB port permits connection to a laptop computer. SMART SYSTEM PC 
software may be used to troubleshoot and program KNIGHT

®

 functions, 

set date and time, monitor historical data, including faults, trends and 
energy consumption.

Refined Design Puts More Control

and Information at Your Fingertips

scree

en 

Yellow Screen

Maintenance due - shows 
the installer’s name and 
number on the display.

Blue Screen

Normal system
operation.

Red Screen

Lockout mode - shows 
active fault and 
installer's name and 
number on the display.

Reviews: