Final checks before starting the boiler
Read the Crest Service Manual to familiarize yourself
with SMART TOUCH control module operation. Read
this manual, page 48 for proper steps to start boiler.
Verify the boiler and system are full of water and all
system components are correctly set for operation.
Verify the preparation procedures of Section 9, pages 44
- 46 have been completed.
Verify electrical connections are correct and securely
attached.
Inspect vent piping and air piping for signs of deterioration
from corrosion, physical damage or sagging. Verify air
piping and vent piping are intact and correctly installed
per this manual.
Start the boiler
1. Read and follow the Operating instructions in FIG. 9-2,
page 48.
If boiler does not start correctly
1. Check for loose connections, blown fuse or service switch
off?
2. Is external limit control (if used) open? Is boiler water
temperature above 200°F (93°C)?
3. Is the boiler receiving a call for heat?
4. Is gas turned on at meter and boiler?
5. Is incoming gas pressure less than 4 inches w.c. (.99 kPa)?
6. Ignition problems are especially noticeable in new LP
installations and also in empty tank situations. This can
also occur when a utility company shuts off service to an
area to provide maintenance to their lines.
If none of the above corrects the problem, refer to the
Troubleshooting Section of the Crest Service Manual.
Check system and boiler
Check water piping
1. Check system piping for leaks. If found, shut down the
boiler and repair immediately. (See WARNINGS on
pages 44 - 46 (startup) regarding failure to repair leaks.)
2. Vent any remaining air from the system using manual
vents. Air in the system will interfere with circulation
and cause heat distribution problems and noise.
Check vent piping and air piping
1. Check for gastight seal at every connection, seam of air
piping, and vent piping.
Venting system must be sealed gastight
to prevent flue gas spillage and carbon
monoxide emissions, which will result in
severe personal injury or death.
Check gas piping
1. Check around the boiler for gas odor following the
procedure on page 35 of this manual (connecting gas
supply piping).
If you discover evidence of any gas leak,
shut down the boiler at once. Find the
leak source with a bubble test and repair
immediately. Do not start the boiler again
until corrected. Failure to comply could
result in severe personal injury, death, or
substantial property damage.
Check flame and combustion
1. Turn the main power off to the boiler by placing the
“On/Off” switch in the OFF position.
2. Remove the fitting from the flue collector.
Note:
Combustion measurements will be made at this point.
3. Turn the main power on to the boiler by placing the “On/
Off” switch in the ON position.
WARNING
WARNING
For dual fuel models, reference the Crest
Dual Fuel Supplemental Manual.