2
Instruction Manual
SECTION 1 - INTRODUCTION
1.2
UNPACKING CHECK LIST
Your carton will contain many or all of the following
items. Please notify the carrier immediately if there
are any signs of damage to the pump or its parts.
Metering Pump
Injection Check
Valve
Foot Valve
Tubing (0 to 3 Rolls)
Ceramic Foot
Valve Weight
Four-Function Valve
(Optional)
External Control Cable
(0, 1, or 2 Cables)
Tube Connection
Hardware
Figure 1. Unpacking Check Sheet