9
2.4 Terminal Strip Layout
To access the wiring connections inside of the conductivity controller:
1. Disconnect the unit from electrical power.
2. Remove the four (4) screws and the junction box cover on the lower half of the unit.
3. Consult the specific instructions below for the connections required.
AC Power Input
AC Power Input
AC Power Input
AC Power Input
AC Power Input
Hot:
TB2-1
Neutral:
TB1-4
Ground:
TB4-4
Bleed Blowdown Control Relay Output
Bleed Blowdown Control Relay Output
Bleed Blowdown Control Relay Output
Bleed Blowdown Control Relay Output
Bleed Blowdown Control Relay Output
Hot (N.O.):
TB5-1
Hot (N.C.):
TB5-2
Neutral:
TB1-3
Ground:
TB4-3
Feed Output
Feed Output
Feed Output
Feed Output
Feed Output
On/Off
Hot:
TB6-1
Neutral:
TB1-2
Ground:
TB4-2
External Trigger
High:
TB9-3
Low:
TB9-4
Alarm Output
Alarm Output
Alarm Output
Alarm Output
Alarm Output
Hot:
TB6-2
Neutral:
TB1-1
Ground:
TB4-1
(866) 433-6682 • (281) 359-8538 • [email protected] • www.novatech-usa.com