Victorian Playhouse Manual
6x8 and 8x8
Construction Manual © 2007-2008 Little Cottage Co. Page 12
67
68
69
70
71
72
Install the top 2 sheets. Install the front dormer
piece.
Fasten this piece on the bottom.
There should be a gap between the 2x2 and
OSB like there was on the back side.
Install the front piece of OSB with angle cut.
Note: see how it “shoot’s up” into the corner
of the T-bar.
Next install the top piece.
Install the dormer piece and fasten. Then re
-
peat the steps on the other side of the dormer.
These are the V-channel roof braces.