Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 4
19
20
21
22
23
24
Continue with fastening floor. Secure 1
1/4” screw every 8” to 10”.
Securing the last piece of flooring.
Next locate wall panels.
Start with panel A and continue thru
panel H.
Secure wall panel A with 2 1/2” screws as
shown. make sure corners line up and put
pressure on the outside pushing in so wall
is tight against floor as shown.
Repeat on opposite end.