USER GUIDE
VP-3103-111U
10kW VPOC™ Power System
VP-3103-111U-UG-03
Page 6 of 23
VPOC™ Power Shelf Installation
After the Rack Mounting Brackets have been installed on the VPOC™ Power Shelf and the Shelf Support
Brackets have been installed into the rack, the VPOC™ Power Shelf can be installed into the rack.
WARNING
To prevent risk of electrical shock to personnel, ensure that power is not activated inside
the rack while installing equipment. Use a DMM to test any potentially live wires and
verify that electrical power is turned off to the rack.
WARNING
To prevent risk of electrical shock to personnel, ensure that all installation and repairs are
performed by AUTHORIZED SERVICE PERSONNEL ONLY.
The VPOC™ Power Shelf wiring and power requirements are listed below:
•
Connect to branch circuit overcurrent protection in accordance with the National Electric Code,
ANSI/NFPA 70 and in accordance with local electrical standards
•
Use an external input circuit breaker: 80 amps / 2-pole
•
Use conduit or raceway to connect wiring from the VPOC™ Power Shelf to the building
•
Use copper wire 60°C / #6 AWG
To Install the VPOC™ Power Shelf into the Rack:
1.
If VPOC™ Lithium-Ion Battery Modules are going to be used in this installation, remove both
Lithium-Ion Battery Module cover plates by removing the cover plate screws on the bottom of the
VPOC™ Power Shelf (see
❶
below) and removing the cover plates (see
❷
below).
❶
Lithium-Ion battery module cover plate screws (two screws for each plate)
❷
Lithium-Ion battery module cover plate
2.
Carefully lift the VPOC™ Power Shelf and move it into the rack on top of the Shelf Support
Brackets.
3.
Push the VPOC™ Power Shelf into the rack until the Rack Mounting Brackets align with the rack
and loosely attach it to the shelf with four M6 screws.
4.
Torque all M6 screws to 6.1 N-m (4.5 ft-lbs).