17
4. Transport
Displacement by crane
- Has the crane enough carrying capacity?
- Fix quadruple suspension gear with adequate carrying capacity using jack rings
provided (pos. 11)
- Lift carefully
Danger!
- Do not allow any persons to loiter under suspended loads at
any time!
- Always keep an eye on the floor cutter!
5. Operation
5.1 Regular cutting operation
-
Start preparations (see 3.4)
5.2 Cutting with electronically controlled feed function
(applicable for reinforced concrete only)
- Start electronical control (pos. 34)
- Push steering lever (pos. 24) in direction of motion
- Raise speed by turning control knob (pos. 25)
Attention
! If the rate of speed is selected too high, there is a risk of
considerable fluctuations of the feed motion due to electronical
control