background image

14

15

 leCTroCounT Ground sTraP KIT

lectroCount Ground strap Kit

All seat cushions are grounded in a similar manner. 

The illustrations on the next page detail the following 

instructions for grounding three typical types of truck 

seats. 

To ground a truck seat: 

1.  Identify any adjustable, shock absorbing seat in the truck 

cab. These seats will typically have pivot points, hinges, 

or other mechanical design features that make seat 

adjustments possible. 

2.  Find an existing screw or hole near the back of the seat 

frame, close to the cab floor. If a hole or screw does not 

already exist, drill a 9/32” hole in the seat frame.

3.  Attach one end of the ground strap to the seat frame 

bracket using the lock washer, flat washer and nut 

provided. 

4.  Find an existing screw or hole, or drill a 9/32” hole, 

in the part of the seat frame—above all pivots and 

adjustments—that is attached directly to the seat cushion. 

Make sure that there are no intervening pivot points, 

guides, adjustment mechanisms, etc., which could 

interfere with the ground path between the seat cushion 

and the ground strap.

4a.  If the seat cushion has a wooden base, use a wood 

screw and washer to attach the strap lug to the bottom 

of the seat at a point where the seat fabric is attached to 

the wood. There must be good contact between the seat 

fabric and ground strap lug.

5.  Use the wire ties provided with the kit and tie off the strap 

so that it doesn’t interfere with the movement of the seat 

and is clear of traffic areas in the cab.

6.  Check the strap for a good ground connection (see 

below).

Remove any dirt or oxidation from the ground strap 

contact point. Lock washers should penetrate any 

paint to ensure a good electrical connection.

Ensure a Good Ground

LectroCount Ground Strap Kit - 82185

Install the LectroCount Ground Strap Kit 

before installing the LectroCount register.

.

 esd Precaution 

.

Some truck seats, typically passenger seats, are 

not adjustable and do not require grounding.

Grounded Passenger Seats

TyPICal adjusTable TruCK seaTs & Ground CHeCK

Checking for a Good Ground

After installing the ground kits, use a multimeter to confirm that the seat and printer are both grounded properly.

To check for a good ground connection:

1.  Turn OFF all accessories, including the dome light, to prevent other currents from distorting the reading.
2.  Take a multimeter and measure the resistance between the brackets the two ground strap bolts are fastened to. Find a clean 

spot on the brackets without paint to use as contact points. Other bolts on the brackets are often suitable.

2a.  If the resistance is less than 3Ω, the system is grounded adequately.
2b.  If the resistance is still greater than 3Ω, check for proper metal to metal 

contact on both ends of the ground strap. Clean any paint, dirt, or oxidation 

that may block the grounding point. If the resistance remains above 3Ω, 

attach the ground strap to a different ground point. Repeat the process until 

the ground resistance is below 3Ω.

If the multimeter reads “

MΩ

” or “

KΩ

”, typically, 

one of the accessories is still on.

Turn Off Accessories

aIr CusHIon seaT - 

ADJUSTABLE FOR HEIGHT

(Bostrom 914 Series, National 2000 Series, or equivalent)

aIr CusHIon seaT - 

ADJUSTABLE FOR HEIGHT

(Dura-Form or equivalent)

benCH seaTs - 

ADJUSTABLE FOR DISTANCE TO THE STEERING WHEEL

(Manufacturer Standard or equivalent)

Typical adjustable Truck seats

6

1

2

3

3

5

8

4

9

Summary of Contents for LectroCount LCR-II E3657 Series

Page 1: ...LectroCount LCR II Installation Liquid Controls An IDEX Energy Fuels Business Operation EM150 21 E3657 E3658 Series LectroCount LCR II SELECT INCREASE Gallons S3...

Page 2: ...se 2 ou une alimentation lectrique isol e et comportant un dispositif de protection contre la surtension de 5 amp res ou moins sont requises pour l installation Peripheral equipment must be suitable f...

Page 3: ...a known good ground less than 1 Use a 12 ga or larger stranded wire Fixed Installations LectroCount housings directly mounted to the meter are attached to the earth ground through the meter via the ta...

Page 4: ...ower cable Specifications Safety Tag Markings EU Explosive Atmospheres symbol This equipment has been found to comply with the European Directive for Equipment For Potentially Explosive Atmospheres 94...

Page 5: ...8 Dimensions Side Front Top 15 9 94 5 19 LectroCount LCR II 13 7 5 8 04 10 5 70 Rear...

Page 6: ...ghts Measures custody transfer product delivery and ticket generation Metrological data collection Presetting by volume Multiple production selection Security settings Air and vapor elimination with p...

Page 7: ...y standard for many applications Multi layered tickets are available to provide a physical record for both customers and business records The Epson roll printer is ideal for recording multiple custody...

Page 8: ...xidation from the ground strap contact point Lock washers should penetrate any paint to ensure a good electrical connection Ensure a Good Ground LectroCount Ground Strap Kit 82185 Install the LectroCo...

Page 9: ...nd discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close th...

Page 10: ...es Data and Power Cable The LCR II shipment typically includes a gray 40 power cable and a 40 black data cable prewired to terminal blocks on the LCR II CPU board On typical truck installations the ca...

Page 11: ...Preset Valve Single Stage Electro Pnuematic Valve with V 7 Valve S1 Solenoid V 7 Valve Electro Pnuematic Actuator LectroCount LCR II Gallons A2859 11 Block Valve and 3 Way Solenoid Single Stage 3 Way...

Page 12: ...eries Electro Pnuematic Valve Electro pnuematic valves use a S1 solenoid operated valve mounted to a pneumatic actuator to open and close a V 7 valve These valves are typically used in high viscosity...

Page 13: ...llations When ordered as part of a meter system with a LCR II Liquid Control s optical air and vapor eliminators are bolted onto the strainer and wired to the LCR II at the factory Optical air and vap...

Page 14: ...d PN 81944 that mounts directly to the LCR II CPU board Typically a P transducer operates in conjuction with a shutdown device such as a valve or a dead man The shutdown control must be wired to the L...

Page 15: ...llation J1 RS 232 A Liquid Controls meter system with a LCR II typically includes an Epson slip printer or roll printer Installation is the same for both printers LCR II s are typically shipped with a...

Page 16: ...ng Device B RS 485 J2 24 red J2 25 violet Multimeter Network B RS 485 J2 24 red J2 25 violet Power Installation Power Installation Overview When you have made all of the data connections and finished...

Page 17: ...r the LCR II has been installed check to make sure that it powers up correctly The LCR II display and the printer power light should come on when the truck s ignition is turned to the ON or to the ACC...

Page 18: ...er provided and held in place with the cotter pin provided The control switch on the front of the LCR II is also sealed with an O ring and held in place by a bushing secured with three socket head cap...

Page 19: ...sher 2 81994 PULSER 100 PPR Pulser Field Install Kit 82597 08189 Flat Washer 08201 O ring 2 Optional Items not shown Description Part Number Roll Printer Extension Cable 71237 Flash Cable 81885 Lap Pa...

Page 20: ......

Page 21: ...2014 Liquid Controls Pub No 500392 7 14 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com...

Reviews: