Link 7224E000 Operation & Maintenance Manual Download Page 4

 

6. MAINTENANCE 

The DD2000 is designed to last for many years without any major maintenance. Periodically, check 
the following items: 

 
Each Time the System is Used: 

 

Listen for unusual noises and watch to ensure proper movement of the system.  If there is a prob-
lem, correct it before continuing to use the system. 

 
Annually: 

 

Check tightness of all fasteners. (Refer to Torque Table below) 

 

Visually inspect for cracks or damage at all pivots on the framework and torsion bar and replace piv-
ot bushings or pins if necessary. 

 

Check for cracks in the framework and decks and repair or replace if necessary. 

 

Verify that the electrical control system functions as intended.

 

 

TORQUE TABLE 

FASTENER 

TORQUE 

3/8-UNC NUTS 

30-40 FT-LBS 

7/16-UNC NUTS 

50-60 FT -LBS 

1/2-UNC NUTS 

80-100 FT-LBS 

 

Park the vehicle in a level, flat area, and apply the parking brake before performing any 
maintenance. 

 

Turn the 

“System Lock” 

key switch to the “Off” position and remove the key before performing any 

maintenance. 

 

Perform maintenance work from outside the deck, whenever possible. 

 

CAUTION 

 

Perform these checks with the Upper Deck lowered. 

 

CAUTION 

Summary of Contents for 7224E000

Page 1: ...nter IA USA 51250 2120 712 722 4868 Fax 712 722 4779 www linkcmp com QUESTIONS CALL CUSTOMER SERVICE 1 800 248 3057 The Link DD2000 fits most full size cargo vans 72242112 NOV 28 2017 OPERATION MAINTE...

Page 2: ...ages that follow this symbol to avoid possible injury or death WARNING WARNING indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTION CAUTION...

Page 3: ...he bier pins if caskets or by placing the legs in the cups hospital cots 5 Raise the top deck and place items to be trans ported on the bottom deck taking care to proper ly secure the load 6 Turn the...

Page 4: ...torsion bar and replace piv ot bushings or pins if necessary Check for cracks in the framework and decks and repair or replace if necessary Verify that the electrical control system functions as inte...

Page 5: ...rm 8 Connect the new actuator s to the control wiring harness Ensure that all persons are clear of the cargo area and test the operation of the deck through several cycles Procedure for clearing block...

Page 6: ...ery and control box NO VOLTAGE Check for voltage at actuator connectors when Control Switch is operated Check for opposite voltage when Control Switch is operated in other direction OK Actuator clutch...

Page 7: ...7 DD2000 ASSEMBLY PN 7224E000 MEDICAL EXAMINER VERSION PN 7224F000...

Page 8: ...HEX NYLOCK NUT GR B 8 42 72242121 WELDMENT CROSSMEMBER 1 14 14801200 3 8 UNC SERRATED FLANGE NUT 22 43 72242122 WELDMENT FRAME RIGHT 1 15 14801201 3 8 UNC TOP LOCK FL NUT GR F 4 44 72242123 WELDMENT...

Page 9: ...C10 8 32 X 1 1 4 OVAL HD MACH SCR SS 8 9 1470 0800 1 4 UNC HEX NUT GR B 4 10 1478 0C00 8 32 UNC HEX NYLOCK NUT GR B ZINC PLT 16 11 1484 0808 1 4 20 X 7 16 SLAB BASE WELD NUT 24 12 14880B00 10 SAE PLAI...

Page 10: ...1484 0808 1 4 20 X 7 16 SLAB BASE WELD NUT 32 7 72241004 FRAME DECK TOP 1 20 14880B00 10 SAE PLAIN WASHER 14 8 72241005 BRACKET PIVOT TOP 2 21 1506 0033 1 4 20 X 3 4 SOCKET BUTTON HD SS CAP SCREW 16 9...

Page 11: ...11 LINK MANUFACTURING LTD 223 15TH ST NE SIOUX CENTER IA 51250 1 800 248 3057...

Reviews: