
Calibrate Boom Length - Pin And Latching Booms
Note: Adjust soft stop on PAT reel first. Refer to
“Calibrate Boom Length-PAT Reel Initial Setup”.
1.
In Access Level 2, Calibration and Programming,
use Buttons 2 and/or 4 to navigate to Boom
Length.
2.
Press Button 3 to enter Boom Length.
4.
Fully retract the boom for the first calibration point.
With the boom fully retracted and in the “PINNED
and LATCHED” condition, press Button 3 which
will place a green checkmark by the
Set Fully Re-
tracted
position as in the example above.
Note: Pressing Button 2 and/or 4 will navigate
through the extended sections to be calibrated
highlighting them in BOLD type.
5.
Extend the boom until the next section is extended
and is PINNED and NOT LATCHED and the tele-
scope cylinder is returning to the home position.
Note: Section must be PINNED and NOT
LATCHED before calibration will be accepted.
6.
Press Button 3 to set the next extended section
boom length and a green checkmark will appear
indicating the calibration point. Repeat this pro-
cedure until all sections have been extended.
Note: The last section will not PIN and UNLATCH.
7.
When completed all sections will have green
checkmarks indicating all sections have been cal-
ibrated.
8.
Boom Length Calibration is now complete.
3. Use Buttons 2 and/or 4 to navigate to Set Fully Re-
tracted.
Summary of Contents for PULSE
Page 2: ......
Page 3: ......
Page 4: ...Link Belt Pulse Calibration Manual ...
Page 21: ...beams ...
Page 48: ...piston pressures and the number on the right for ...
Page 61: ...22 Use the left mouse button to click on the Start button ...