background image

 

INSTRUCTIONS FOR STARTUP 

AND OPERATION 

    the suitable connection diagram that you receive 

in the catalogue or that is supplied together with 
the  product.  In  the  event  of  any  ambiguity,  call 
the phone number stated above. 

 
 
 
 
 
 

 

Make  sure  the  convector  interior  is  clean  and 
dry. 

 

De-aerate  the  connected  heat  exchanger  and 
inspect the piping connections for any leakage. 

 

Connection to electric mains shall be carried out 
by a qualified person. 

 

Check  the  operation  of  ventilation  fan  at  all 
speeds. 

 

In case of a convector controlled by a room ther-
mostat, set the desired temperature. 

 

The grille is dimensioned for normal loading, i.e. 
human  weight.  If  higher  loads  (car  drive)  are 
anticipated, the convector shall be fitted with an 
additional “bridge”. 

 

During the operation, upper part of the convector 
(grille) shall not be covered due to possible over-
heating. Make sure that air flow is not disturbed. 

 

Check the condensate elimination piping for any 
leakage (TKH). 

 

If fresh air is supplied to the device, its tempera-
ture should not be lower than 5 °C. 

 

When  connecting  the  piping,  make  sure  not  to 
damage  soldered  joints  on  the  water  heat  ex-
changer connections. 

 

When  connecting  floor  convectors  in  permanent 
installation, a device to separate all phases from 
the mains shall be provided, with the open con-
tact clearance of 3 mm. 

 

Any intervention beyond the standard connection 
is considered an intervention into the device and 
shall only be attempted with prior approval by the 
manufacturer. 

 

In  case  that  water,  not  caused  by condensation 
enters  into  forced  ventilation  floor  convector, 
power supply shall be switched off. 

 

Into very humid areas such as bathrooms, toilets, 
swimming  pools  should  be  installed  special  ver-
sions for humid spaces (TK-S, TKV-S). 

 
 
 

 
Before  any  intervention,  cleaning  or  maintenance, 
make sure that the device is disconnected from the 
power  supply,  that  the  supply  valve  is  closed  and 
that the conductor has cooled. 
 

 

Grilles: clean by means of a damp cloth and the 
detergent, vapor, ... 

 

The  internals  of  the  floor  convector:  periodically 
clean with a vacuum cleaner (length of the clean-
ing interval depends on dust density - amount of 
dirt  in  the  room).  If  the  inside  is  very  dirty,  the 
heat conductor should be lifted, if this is possible 
for the flexible installation of the conductor, the 
inside should be cleaned and the heat conductor 
should be cleaned with a high pressure cleaning 
device  (performed  by  an  authorized  servicing 
service). Make sure, that condensate elimination 
hose  is  clean,  otherwise  it  can  cause  flowing of 
water over the collection tray.  

 

Fan:  the  input-output  parts  of  the  fan  must  be 
free and clean. 

 

Heat  conductor:  the  surface  of  the  conductor 
must be clean so that air can flow through. It is 
prohibited to throw any objects, liquids or waste 
into the convector. 

 

Spare parts: When ordering spare parts, indicate 
the model and description of the convector. It is 
also  recommended  to  indicate  the  convector’s 
serial  number.  The  builder’s  plate  is  located  on 
the  side  of  the  convector,  near  the  valves  and 
power connection.  

 
The fan does not work or is not rotating properly: 

 

Check  if the wires  are  connected  in  accordance 
with the connection diagram.  

 

Check whether the unit has a power supply. 

 

Check  if  the  fan  is  clean  and  that  there  are  no 
objects on the fan that would prevent it rotating. 

 
The convector does not heat or cool: 

 

Check  whether  the  flow  of  water  is  enabled, 
whether  the  valves  are  open  and  ventilate  the 
conductor. 

 

Check whether the water supply is completely in 
order (if it is warm/cold enough). 

 
 

WARNING 

CLEANING, MAINTENANCE 

AND SPARE PARTS 

TROUBLESHOOTING 

5

 

Reviews: