PRECISION TIG 185
TROUBLESHOOTING & REPAIR
F-23
F-23
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Master TOC
Retur
n to Master TOC
Retur
n to Master TOC
Retur
n to Master TOC
3. Using an analog ohmmeter test the
resistance from anode to cathode of
SCR1. Reverse the meter leads and
check from cathode to anode of
SCR1. See Figure F.4. If a low resis-
tance is indicated in either direction
SCR1 is faulty. Replace SCR Bridge
Assembly. See
SCR Bridge
Assembly Removal and
Replacement
.
4. Repeat Step #3 testing SCR2, SCR3
and SCR4.
5. The further check the SCR’s func-
tions use an SCR tester and proceed
to the
Active SCR Test
.
STATIC SCR TEST
(continued)
SCR1 ANODE
SCR1 CATHODE/SCR2 ANODE
SCR2 CATHODE
SCR3 CATHODE
SCR4 ANODE
SCR3 ANODE/SCR4 CATHODE
FIGURE F.4 SCR TEST POINTS