![Lincoln Electric POWER WAVE S500 Operator'S Manual Download Page 15](http://html1.mh-extra.com/html/lincoln-electric/power-wave-s500/power-wave-s500_operators-manual_1918460015.webp)
A-5
INSTALLATION
POWER WAVE
®
S500
On some models, toroids are on the power cord. When replacing
the power cord, it is important to put the toroids on the new power
cord in the same location and with the same number of turns.
CONNECT EACH PHASE OF A
THREE-PHASE CONDUCTOR
HERE
INPUT POWER
ACCESS DOOR
INPUT CORD
STRAIN RELIEF
CE FILTER
GROUND CONNECTION
CONNECT GROUND
LEAD PER LOCAL AND
NATIONAL ELECTRIC CODE
ROUTE INPUT CORD THROUGH
RELIEF AND TWIST NUT TO TIGHTEN
FIGURE A.1 - S500 CE