![Lincoln Electric K2803 Operator'S Manual Download Page 16](http://html1.mh-extra.com/html/lincoln-electric/k2803/k2803_operators-manual_1919114016.webp)
English
English
13
TANDEM ARC (2-ARC) SYSTEM CHECKLIST (See Tandem Arc Connection Diagram)
Place Power Wave
®
AC/DC 1000 SD CE units in suitable operating location.
Mount MAXsa™ 10 Controllers.
Install MAXsa™ 22 Wire Drives and other accessories in their operating location.
Connect a K1785-xx Wire Feeder Control Cable (14 pin) between the two power sources (top connectors).
Connect K2683-xx Heavy Duty ArcLink Control Cables (5 pin) between Power Wave units and MAXsa™ 10
controllers.
Connect K1785-xx Wire Feeder Control Cable (14 pin) between the MAXsa™ 10 controllers and the MAXsa™ 22
feeders.
Install Electrode Sense Lead (67) at each feeder and the Work Sense Lead (21) from the Lead Power Wave
®
AC/DC 1000 SD CE Master per guidelines.
Connect / Install welding cables per recommended "Output Cable Guidelines" ." (see
Table1: Output Cable
Guidelines)
Open the Power Wave
®
AC/DC 1000 SD CE front panels and configure DIP switch settings per the decal on the
panel. (see
Figure #2: Dip Switch Settings)
.
Connect input power to Power Wave
®
AC/DC 1000 SD CE units per recommended guidelines.
Turn
on
Power
Wave
®
AC/DC 1000 SD CE and verify all system Status Lights are solid green.
Confirm that the latest software is updated in all equipment prior to installation (www.powerwavesoftware.com).
Run the subarc cell configurator from PC Tools (see section accessories of this manual or go to
www.powerwavesoftware.com).
Select a Welding process and configure starting and ending options.
Summary of Contents for K2803
Page 11: ...English English 8 Cruiser Connection Diagram...
Page 13: ...English English 10 Single Arc Connection Diagram...
Page 15: ...English English 12 Tandem Arc Connection Diagram...
Page 17: ...English English 14 Paralleling Connection Diagram...
Page 19: ...English English 16 MAXsa 19 Connection Diagram...