![Lincoln Electric K2803 Operator'S Manual Download Page 12](http://html1.mh-extra.com/html/lincoln-electric/k2803/k2803_operators-manual_1919114012.webp)
English
English
9
CRUISER™ SYSTEM CHECKLIST (See Cruiser Connection Diagram)
Place Power Wave
®
AC/DC 1000 SD CE in suitable operating location.
Place the Cruiser™ Tractor in it’s operating location.
Connect K2683-xx Heavy Duty ArcLink Control Cable (5 pin) between Power Wave
®
AC/DC 1000 SD CE and the
Cruiser™ Tractor.
Install Work Voltage Sense Lead (21) from the Power Wave
®
AC/DC 1000 SD CE per recommended guidelines.
Connect / Install welding cables per recommended "Output Cable Guidelines" (see
Table1: Output Cable
Guidelines)
Open the Power Wave
®
AC/DC 1000 SD CE front panel and check the DIP switch settings per the decal on the
panel. Factory Setting is “Master-Lead”.
(
see
Figure #2: Dip Switch Settings)
.
Connect input power to Power Wave
®
AC/DC 1000 SD CE per recommended guidelines
Turn
on
Power
Wave
®
AC/DC 1000 SD CE, and verify all system Status Lights are solid green.
Select a Welding process and configure starting and ending options.
Summary of Contents for K2803
Page 11: ...English English 8 Cruiser Connection Diagram...
Page 13: ...English English 10 Single Arc Connection Diagram...
Page 15: ...English English 12 Tandem Arc Connection Diagram...
Page 17: ...English English 14 Paralleling Connection Diagram...
Page 19: ...English English 16 MAXsa 19 Connection Diagram...