
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Master TOC
Retur
n to Master TOC
Retur
n to Master TOC
Retur
n to Master TOC
TROUBLESHOOTING & REPAIR
F-49
F-49
IDEALARC R3R
SCR REMOVAL AND REPLACEMENT
(continued)
CLAMPING PROCEDURE
FOR 1/4-28 CAP SCREWS
NOTE:
This procedure can only be used with
1/4-28 cap screws.
Do not use cap screws with any other type
thread or new SCR will be damaged.
Do not over tighten cap screws. The leaf spring
will apply the required clamping force to the
SCR.
1. Do not turn the nuts. While holding the nuts
stationary, turn the cap screws only with the
following procedure.
2. Tighten first cap screw 1/4 turn.
3. Tighten second cap screw 1/2 turn.
4. Tighten first cap screw 1/2 turn.
5. Tighten second cap screw 1/2 turn.
6. Tighten first cap screw 1/4 turn. Stop.
7. Assembly now has the proper clamping
force.
8. Perform the
Active SCR Test.
CLAMPING PROCEDURE
FOR 1/4-20 CAP SCREWS
NOTE:
This procedure can only be used with
1/4-20 cap screws.
Do not use cap screws with any other type
thread or new SCR will be damaged.
Do not over tighten cap screws. The leaf spring
will apply the required clamping force to the
SCR.
1. Do not turn the nuts. While holding the nuts
stationary, turn the cap screws only with the
following procedure.
2. Tighten first cap screw 1/4 turn.
3. Tighten second cap screw 1/2 turn.
4. Tighten first cap screw 1/2 turn.
5. Tighten second cap screw 1/4 turn. STOP.
6. Assembly now has the proper clamping
force.
7. Perform the
Active SCR Test.