Connecting LN-10 and DH-10 to the Flextec 350x CE
CONTROL SETTING
WELD MODE
CV, CV-INNERSHIELD
WELD TERMINALS
REMOTELY CONTROLLED
REMOTE/LOCAL
REMOTE
VOLTMETER POLARITY
PROCESS DEPENDENT
LN-10,DH-10 Control Switch Setup
Initial set up of the LN-10, DH-10 control for the system
components being used and for general operator
preferences is done using a pair of 8-pole DIP switches
located inside the LN-10, DH-10 control box.
Setup DIP Switch Access
1. Shut off the input power to the LN-10, DH-10 control
by turning off the power at the welding power source
it is connected to.
2. Remove the two screws on the top of the LN-10,
DH-10 control box door and swing the door down to
open.
3. Locate the two 8-pole DIP switches, near the top left
corner of the LN-10, DH-10 Control P.C. board,
labeled S1 and S2.
4. Switch settings are only programmed during input
power-up restoration.
Setting the DIP Switches
The DIP switches are each labeled with an “ON” arrow
showing the on direction for each of the 8 individual
switches in each DIP switch (S1 and S2). The functions
of these switches are also labeled and set as described
below:
14 PIN CONTROL CABLE K1501-XX
ELECTRODE
WORK
WIRE FEEDER
PWR SOURCES
HEAD
PWR SOURCES