8695 4788 / A
D - ASSEMBLY AND INSTALLATION
OPTITOME HPC 2
D-25
5 - CONNECTING THE ENERGY SUPPLIES
Please refer to the location and energy supply drawings supplied
IMPORTANT! After switching on the power to the machine, check
the whole machine with an optical level, setting the sight on the
ends of the beam guide rail and moving the machine electrically;
if necessary, readjust with the help of the adjustment screws and
the fastening plates.
Note: In no event is there any need to disengage the power
systems
Summary of Contents for 07005010NG
Page 5: ...8695 4788 A OPTITOME HPC 2 A 1 A IDENTIFICATION Quote this information in all correspondence ...
Page 11: ...8695 4788 A B SAFETY INSTRUCTIONS OPTITOME HPC 2 B 7 ...
Page 14: ...C DESCRIPTION 8695 4788 A C 10 OPTITOME HPC 2 3 MECHANICAL ASSEMBLY ...
Page 30: ...D ASSEMBLY AND INSTALLATION 8695 4788 A D 26 OPTITOME HPC 2 ...
Page 44: ...F MAINTENANCE 8695 4788 A F 40 OPTITOME HPC 2 ELECTRICAL PART ...