background image

Service Manual Traverse Switch

 

• 3EN120401 Rev. 7   

www.liko.com  

l

  www.hill-rom.com 

5.0 Periodic Inspection Information, Traverse Switch

According to ISO 10535:2006 Annex B, Periodic Inspection of medical device Liko™ overhead rail systems 

should be performed at least once a year. Periodic Inspection Liko™ overhead rail system (3EN111001) is 

 

available in Agile and on the Partner Web.

Periodic Inspection protocol

Liko™ overhead rail system

3EN111001 Rev. 13

1(12)

INSTALLATION

 Action required:

Approved

Not 

approved

1

Decal rail marking

2

General inspection

3* Rails

4

End stops

5

Ceiling/Wall attachments 

System information

Customer reference

Type of rail system:

Agreement No:

S/N:

Name:

Approved Max Load:

Address:

Year of installation:

Post Code

 

 

ADDITIONAL  COMPONENTS                

N/A S/N:

  Action required:

Approved

Not 

approved

6*

Rail Switches

7

Ultra Twist

8

Transfer Motor Traverse

9

Activity Rail

10

Pool Side Lifter

ENVIRONMENTAL IMPACT

11

Corrosive environments

LOAD TESTING

Max Load applied:  

Approved Not 

approved

12

Maximum load rail system

 Kg:                                                         Lbs:   

                             

REQUIRED MEASUREMENTS:

N/A

Dimension and unit 

Approved Not 

approved

3*     Joint Gap

mm:                                                        Inch:

6B*  Rail Switch play

mm:                                                        Inch:

6C*  Turn Table clearance

mm:                                                        Inch:

Inspection sign off

Complete inspection according to the  instructions (page 2-11), fill in this page and sign below.

Approval to use the overhead system           

 

Approved

      

 

Not approved

 

If the overhead system has one or more inspection points “Not approved”, the system must not be used. 
Action required:

 

Actions according to the inspection items "NOT APPROVED" should be performed immediately. After performed actions 

sign below. If anything is unclear or if you have questions, please contact Hill-Rom or your local Hill-Rom representative. 

Contact information is to be found at www.hill-rom.com. 

Inspection performed by:

Date

:

Next inspection:

Inspection performed in accordance with ISO 10535:2006 Annex B- Periodic inspection

Liko™ Overhead Rail System must be thoroughly inspected at least once per year. Inspection and service must be carried out by Hill-Rom authorized personnel.

 

See "Installation condition checklist" on next page, to determine how to perform inspection points 2 and 5. 

Periodic Inspections are available for: Liko™ Overhead Lifts (3EN191001), FreeSpan and FreeStand (3EN301001), Accessories (3EN601001) and Mobile Lifts (3EN371001)

North America only: For non Liko™ Rail system, use “Non Liko® Rail Installation Periodic Inspection” (193725)

If printed: Make a colour print of this instruction. 

Liko technical documentation can be found on the Partnerweb:

https://partner.liko.com - “My information” - “Documents” 

If you don’t have access, send a mail for registration to: [email protected]

 

Periodic Inspection may only be performed by personnel authorized by Hill-Rom and using 

 

original Liko™ spare parts.

Available Liko Periodic Inspections:

• 

3EN371001 Periodic Inspection Liko™ mobile lifts

• 

3EN111001 Periodic Inspection Liko™ OH rail system

• 

3EN191001 Periodic Inspection Liko™ overhead Lifts

• 

3EN301001 PI Freespan™ - Freestand™ freestanding lift systems

• 

3EN601001 Periodic Inspection Liko™ accessories

Also available is Periodic Inspection Slings. This inspection should be performed by a person who is 

 

suitable, has good experience and sufficient knowledge about design, use and maintenance of the sling. 

• 

7EN160834 General Periodic Inspection Protocol Liko Slings and Sabina SupportVests

NOTE! 

Periodic Inspection shall be performed at least once per year.

INF

ORMA

TION

Summary of Contents for 3124604

Page 1: ...3EN120401 Rev 7 ENGLISH Traverse Switch rail switch system Service Manual Product No 3124604...

Page 2: ...omponents manufacturing parts are not available after last manufacturing date Repairs and maintenance may only be performed by personnel authorized by Hill Rom and using original Liko spare parts For...

Page 3: ...ev 7 3 www liko com l www hill rom com Page 1 0 Technical Data 4 2 0 Troubleshooting 5 3 0 Spare Parts Assembly information 6 4 0 Spare Parts List 7 5 0 Periodic Inspection Information 8 6 0 Product C...

Page 4: ...nsport and Storage The environment in which the product is transported and stored should have a temperature of 10 40 C and a relative humidity of 30 75 The air pressure should be 700 1060 hPa Recyclin...

Page 5: ...t the cable is properly connected to the power supply 3 Check that hand control is firmly connected 4 If the switch still does not work correctly contact Hill Rom The switch stops in close or 1 Check...

Page 6: ...by Hill Rom and using original Liko spare parts Actuator LA12 St lldon LA12 Assembly Instruction Monteringsanvisning Prod No 31790001 3SE690217 02 2012 10 01 Tools required 17 mm 6 mm Contains Qty Ac...

Page 7: ...1290125 515 Damper Required on Carriage installed in system with Traverse Switch according to Installa tion Handbook pair 3SE640257 31290126 516 Damper QR Required on QR Carriage 3126008 installed in...

Page 8: ...ar or if you have questions please contact Hill Rom or your local Hill Rom representative Contact information is to be found at www hill rom com Inspection performed by Date Next inspection Inspection...

Page 9: ...h actuator The configuration allows change of position of the actuator from the fixed rail to the secondary rail in the overhead system The slimline pendant has expired so the Traverse switch stabiliz...

Page 10: ...Liko AB Nedre v gen 100 SE 975 92 Lule Sweden www hill rom com I www liko com Copyright Liko R D AB 2017...

Reviews: