
32.)
Bring the entire third level above the building then take the spare end of
the 30cm Connecting Cable from the second level underneath and connect it
to the Strip Light underneath the 3rd level. Securely reconnect the third level on
top, then turn ON the USB Power Bank to test all the lights we installed so far
are working OK.