62.)
Fold the larger group of Bit Light cables in half and then thread the folded
end down through the space that leads to the inside of the Hall. Neatly hide the
rest of the cables and expansion board down underneath the trans coloured
plates before reconnecting all roof and surrounding pieces over the top.
Summary of Contents for LBM 971043
Page 70: ......
Page 80: ...Using a pair of scissors snip off the tips at the bottom of each flame piece ...
Page 101: ......
Page 106: ......
Page 107: ...Turn ON the USB Power Bank to verify all lights installed so far are working OK ...