USER MANUAL
–
HDN
–
EN VERSION 02.01
Liftup A/S
| Hagensvej 21 | DK-9530 Støvring | Denmark |
T:
+45 96 86 30 20 |
M:
[email protected] | www.liftup.dk | CVR DK-1015 3964
21
15.
Maintenance checklist
In addition to the general maintenance described in section 12, we recommend, as the
manufacturer, that routine inspections are undertaken every 6 months by an authorised* service
technician. The dealer you have bought the product from will offer this service, but if you wish
to use another service provider, the owner of the HDN lift is responsible for ensuring that the
chosen service technician is qualified in the product in question.
(Cf.
https://www.liftup.dk/en/distributors
For safety reasons it is very important that these inspections are maintained, since lacking or
improperly performed inspections may result in personal injury. Additionally, statutory
inspections of the lift must be undertaken at regular intervals as it has been approved for carriage
of persons. It is the responsibility of the owner to ensure that the inspections are performed.
IMPORTANT!
Before inspecting the lifting platform (or under it), the platform
MUST be dismounted from the controls in order to secure against accidental
operation. The service technician is responsible for performing this disassembly
before starting servicing.
NOTE:
It is not enough to disconnect the 230 V power supply, as the system is fitted
with a battery backup.
*Has completed a Liftup product and service course.
Our recommendations for the number of maintenance inspections in a year:
Outdoor
Indoor
Private
2
1
Public
4
2
(Respecting local regulations)