background image

USER MANUAL 

 HDN 

 EN VERSION 02.01

 

 

Liftup A/S

 | Hagensvej 21 | DK-9530 Støvring | Denmark | 

T:

 +45 96 86 30 20 | 

M:

 [email protected] | www.liftup.dk | CVR DK-1015 3964  

 

 

12 

7.

 

Functioning 

The  HDN  lift  is  a  so-

called  “dead  man  operated”  lifting  platform,

  i.e.  the  buttons  must  be 

depressed during the entire motion.  
 
The platform works simply by the user calling it by pressing one of the buttons on the wall, or 
by  using  the  supplied remote  control  (optional  equipment).  When the  user  is  on  the  lifting 
platform this is operated from the panel by the platform, where one can choose to be conveyed 
to the upper or lower level. 
 
 
 

8.

 

Assembly  

The lifting platform must be installed by an authorised* service technician. Do not attempt to 
transport or uninstall your HDN lift, or to repair it. This MUST be undertaken by an authorised* 
service technician. 
 
Improper assembly can pose risks for user personal safety. Liftup disclaims any liability if assembly 
and installation are not performed by an authorised* service technician. 
 
For more information or materials on assembly, contact your dealer: 
(

https://www.liftup.dk/en/distributors/#

). 

 

*Has completed a Liftup product and service course 

 

 

(Denmark 

only) 

In 

Denmark

,  effective  as  of  30  June  2016  the  Danish  Working  Environment 

Authority has introduced new regulations for owners/users of elevators, lift products 
etc. (Danish Working Environment Authority Executive Order 461 of 23 May 2016). 
This is relevant for the number of preventative maintenance inspections and for the 
statutory control of the erection of the product. In order to quality assure these 
inspections,  Liftup  has  developed  and  implemented  an  online  service  log  which  is 
accessible  for  all our  lift  products.  All  inspections and  controls  in  future must be 
registered in this log (see section 17 for more details on the online service log). 

 
 
 

9.

 

Start-up 

The HDN lift

’s

 control unit should always be connected to a 230V socket and be switched on. 

Normally the lift is in constant stand-by mode, i.e. it is ready for use as soon as one of the 
operating buttons is pressed. 
 

 

 

Summary of Contents for HDN

Page 1: ...Liftup A S Hagensvej 21 DK 9530 St vring Denmark T 45 96 86 30 20 M support liftup dk www liftup dk User manual HDN USER MANUAL HDN EN VERSION 02 01...

Page 2: ...9 6 6 Anti crushing 10 6 7 Avoid personal injury 10 6 8 Safety barriers 10 6 9 Automatic door 11 6 10 Unlocking the door in case of emergency 11 6 11 Handling 11 7 Functioning 12 8 Assembly 12 9 Star...

Page 3: ...30 20 M support liftup dk www liftup dk CVR DK 1015 3964 3 14 Installation and handover 20 15 Maintenance checklist 21 16 Service logbook 23 17 Online service log only certain countries 24 18 Spare pa...

Page 4: ...correct assembly Improper assembly can lead to unintended danger elements The HDN lift is an innovative lifting platform for wheelchair users The solution sees elegant design combined with a robust c...

Page 5: ...t is in compliance with relevant safety and health requirements in EMC Directive 2014 30 EU RoHS Directive 2011 65 EU Radio Equipment Directive 2014 53 EU RED Relevant parts of the following were for...

Page 6: ...USER MANUAL HDN EN VERSION 02 01 Liftup A S Hagensvej 21 DK 9530 St vring Denmark T 45 96 86 30 20 M support liftup dk www liftup dk CVR DK 1015 3964 6 3 Factory Acceptance Test FAT...

Page 7: ...must NOT be used for goods transport including loaded pallets or other types of heavy loads IMPORTANT The owner of this lift is obliged to maintain it according to the Maintenance Guide in section 12...

Page 8: ...chnical specifications Specifications Power 230V 50 Hz min 10A Platform size 1400 x 900 1000 1100 mm Dead weight 110 kg approx Pit depth 350 mm Lifting height 0 500 mm Lifting capacity 400 kg Lifting...

Page 9: ...for approx 5 seconds If the problem continues call technical assistance 6 3 Lift movements The space under the lifting platform must be kept free of all objects that may impair the platform s downward...

Page 10: ...lar It is important that the operator ensures that the platform can move without putting anyone or anything at risk Be extra careful when there are small children and disabled on or near the lifting p...

Page 11: ...n Demount the glass 6 11 Handling The HDN lift is normally supplied by your dealer who also takes care of installation Do not try to move the lifting platform manually as this can lead to permanent in...

Page 12: ...bly and installation are not performed by an authorised service technician For more information or materials on assembly contact your dealer https www liftup dk en distributors Has completed a Liftup...

Page 13: ...for the entire time since the platform will automatically stop when the button is released The lifting platform starts by raising the safety plates and then moves up to the upper level The platform st...

Page 14: ...the platform stops To lower the platform press the arrow button and hold it down until the platform stops and the safety plates are completely down 11 Operation Under normal operating conditions the...

Page 15: ...ken in connection with the regular service inspection This is to be undertaken by an authorised service technician several times a year depending on whether the platform is indoors or outdoors cf sect...

Page 16: ...he lift only a service technician can get access to this Then demount the lid of the receiver box by loosening the 4 screws 2 Press briefly on Connect 1 When the control LED begins to flash slowly the...

Page 17: ...te control begins to flash slowly 2 The remote control is now in installation mode for 2 minutes Perform the following sequence within the 2 minutes Press UP UP DOWN DOWN UP DOWN UP DOWN If successful...

Page 18: ...e course Pairing remote control and receiver 1 To get access to the receiver 107500 the top must be lifted off the lift only a service technician can get access to this Then demount the lid of the rec...

Page 19: ...longer paired with a particular lift do as follows Resetting the transmitter 1 Press the S4 on the transmitter for more than 10 seconds 2 When the control LED begins to flash rapidly the transmitter h...

Page 20: ...N EN VERSION 02 01 Liftup A S Hagensvej 21 DK 9530 St vring Denmark T 45 96 86 30 20 M support liftup dk www liftup dk CVR DK 1015 3964 20 14 Installation and handover The form must be filled out upon...

Page 21: ...t that these inspections are maintained since lacking or improperly performed inspections may result in personal injury Additionally statutory inspections of the lift must be undertaken at regular int...

Page 22: ...EN VERSION 02 01 Liftup A S Hagensvej 21 DK 9530 St vring Denmark T 45 96 86 30 20 M support liftup dk www liftup dk CVR DK 1015 3964 22 A check form like the one below shall be filled out at each in...

Page 23: ...HDN EN VERSION 02 01 Liftup A S Hagensvej 21 DK 9530 St vring Denmark T 45 96 86 30 20 M support liftup dk www liftup dk CVR DK 1015 3964 23 16 Service logbook The logbook shall be filled out at each...

Page 24: ...de can typically but not necessarily be found fitted internally on the safety plates The CE label inserted in section 3 will provide you with the serial number of the specific lift as well as its QR c...

Page 25: ...disassembly for any re use in another installation we recommend using an authorised service technician Contact your dealer for disassembly help Note that a crushing risk may exist when the HDN lift i...

Page 26: ...l conditions NOTE If the prescribed service inspections are not maintained the right of complaint may be lost Failing to perform these inspections can also have serious consequences for product safety...

Page 27: ...___________________________________________________________ _____________________________________________________________________________ ______________________________________________________________...

Page 28: ...USER MANUAL HDN EN VERSION 02 01 Liftup A S Hagensvej 21 DK 9530 St vring Denmark T 45 96 86 30 20 M support liftup dk www liftup dk CVR DK 1015 3964 28...

Reviews: