10
TOOLS AND HARDWARE REQUIRED
X
SECTION 2 (CONTINUED)
AAF
(x2)
ANF
(x2)
ANE
(x2)
5”
(Not actual length)
2.1
ANF
AAF
ANE
Large holes
Small holes
ALH
• After allowing the concrete to cure for at least 72 hours, insert the
Hex Bolts (ANF)
with the
Washers (AAF)
into
the
Top Pole (ALH)
as shown. Then slide the
Spacers (ANE)
onto the Hex Bolts.