17
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
5IFTMPUTJOUIF
Bottom Pole (ALE)
NVTUCFQBSBMMFMUPUIFQMBZJOHTVSGBDF
*GOFDFTTBSZJOTFSUBTUSBJHIUPCKFDU BSVMFSXJSFFUDUISPVHIUIF
TMPUTJOUIF#PUUPN1PMF3PUBUFUIFQPMFVOUJMUIFTUSBJHIUPCKFDUJT
QBSBMMFMUPUIFQMBZJOHTVSGBDF
SEC
1.4
Note: Use a Level to make sure the Bottom Pole is standing vertical. Form
the cement into a downward slope away from the pole to allow water runoff.
Failure to do so may result in premature rusting of the Pole.
!
Playing Surface
NO TOOLS OR HARDWARE REQUIRED FOR THIS PAGE