50
HARDWARE REQUIRED
CLIMBING WALL AND CHALKBOARD ASSEMBLY
7
CAJ
PARTS REQUIRED
TOOLS REQUIRED
(1)
CONTENTS OF BOX 1
CONTENTS OF BOX 4
ADV
(x10)
CAD
CHX
(x2)
ASF
(x2)
ARV
(x3)
CBY
(x1)
CBZ
(x1)
CBX
(x2)
LARGE PLASTIC PARTS
1/4 in/po (≈7 mm)
(1)
(1)
(1)
Hardware Bag
Hardware Bag
ADW
(x10)