45
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
"+:
AAZ
SEC
5.11
)PPLPOFPGUIFFOETPGB
4QSJOH "+:
into the #2 hole on the
Left
#BDLCPBSE#SBDLFU "++
as shown.
SEC
5.12
Using the closed end of a Wrench, stretch the
4QSJOHT "+:
up and over
the
3/8” x 7” Hex Bolt (AAZ)
as shown.
Note: Make sure all hardware has been securely tightened before moving to the next section.
!
Wrench
/0)"3%8"3&3&26*3&%'035)*41"(&
Note: Repeat this step to hook the end of the other Spring
into the #2 hole in the Right Backboard Bracket (AJK).
!
"+:
"++
2