11. Joint each end of Top G4 Pole (17) by the clip of connector at
each opening. The Top Sleeve of the Netting (20) become a round
shape.
Attach the first hanging point at the upper edge of the Netting (20)
with the G4 Pole (17) to the Plastic Cap of Top Pole (16).
Attach a second hanging point directly across the Netting (20)
from the first hanging point.
Attach the other two hanging points halfway between the first two
hanging points, so four hanging points are attached as shown.
See insert drawing for attached of G4 Pole (17):
19
10
11
11.a
Insert the pole into sleeve of the Netting(20)
Joint the end of each pole by Clip of Connector
Door of Netting
Top Sleeve
Attached Hanging Point:
10.a
Netting(20)
2SHQLQJ
(17)
Lay out G4 Pole and Joint each section
to one straight line.
BLUE
BLUE
BLUE
BLUE
BLACK
BLACK
Black G4
Black G4
Black G4
Black G4
G
4
Pole(17)
Netting
(22)
Hanging point 1
Hanging point 2
Hanging
point 3
Hanging
point 4
Netting 20
10. Lay out Top G4 Pole (17), joint each section connec-
tor to a straight line as shown.
Assemble the remaining Top G4 Pole (17) in the
same way.
Spread the Netting (20) on the trampoline bed,
insert a Top G4 Pole (17) into the opening of
Top Sleeve on the Netting (20). Insert the
other Top G4 Pole (17) into the opposite opening
of Top Sleeve on the Netting (20).
Summary of Contents for Bazoongi
Page 2: ...2...